Lymington Town
LYTSouth EastManaged by South Western Railway
How this station is performing
Lymington Town had 22,510 scheduled stops to Period 7 of 2026-27, about 62 a day. 97.4% of recorded arrivals were within three minutes of the timetable and 3.8% of scheduled stops were cancelled.
Lymington Town opened on 12 July 1858, 168 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Brockenhurst is the oldest (1847) and New Milton the newest (1888), with Lymington Town in between.
The nearest stations to Lymington Town are Lymington Pier (0.6 km south-east), Sway (5.7 km north-west), Brockenhurst (6.7 km north-west), New Milton (8.5 km west) and Beaulieu Road (10.7 km north). 4 stations lie within 10 km in all. At 97.4%, Lymington Town is more punctual than every one of them; the best of the five, Lymington Pier, manages 95.8%.
Lymington Town is named after Lymington, a town, home to about 15,726 people, but the station stands 1.5 km from its centre.
Lymington Town is among the most punctual stations in Britain. Its 97.4% puts it 26th out of 2,374 ranked stations, with 25 ahead of it and 2,348 behind, and 13.5 percentage points above the national median of 83.9%.
Compared with 3 stations of a similar size in South East, Lymington Town is the most punctual, at 97.4%. The comparison group includes Lymington Pier (95.8%), Beltring (94.7%) and East Farleigh (95.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 22,510 | 97.4% | 3.8% |
Operators with their own page for this station are linked to it.
Late train at Lymington Town? Delay Repay
These operators call at Lymington Town and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,680 | 98.9% | 2.6% |
| Period 6 of 2026-27 | 1,800 | 98.2% | 3.2% |
| Period 5 of 2026-27 | 1,800 | 98.9% | 2.4% |
| Period 4 of 2026-27 | 1,800 | 98.2% | 4.7% |
| Period 3 of 2026-27 | 1,794 | 97.3% | 4.8% |
| Period 2 of 2026-27 | 1,800 | 98.7% | 3.8% |
| Period 1 of 2026-27 | 2,010 | 99.6% | 1.3% |
| Period 13 of 2025-26 | 1,986 | 98.2% | 3.6% |
| Period 12 of 2025-26 | 1,626 | 98.7% | 1.8% |
| Period 11 of 2025-26 | 1,142 | 89.0% | 6.0% |
| Period 10 of 2025-26 | 1,526 | 92.9% | 8.1% |
| Period 9 of 2025-26 | 1,800 | 97.2% | 3.0% |
| Period 8 of 2025-26 | 1,746 | 96.3% | 5.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lymington Pier | 22,510 | 95.8% | 3.8% |
| Beltring | 22,703 | 94.7% | 1.8% |
| East Farleigh | 22,703 | 95.0% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out