How this station is performing
Lymington Pier had 22,510 scheduled stops to Period 7 of 2026-27, about 62 a day. 95.8% of recorded arrivals were within three minutes of the timetable and 3.8% of scheduled stops were cancelled.
Lymington Pier opened on 1 May 1884, 142 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Brockenhurst is the oldest (1847) and New Milton the newest (1888), with Lymington Pier in between.
The nearest stations to Lymington Pier are Lymington Town (0.6 km north-west), Sway (6.4 km north-west), Brockenhurst (7.2 km north-west), New Milton (9.1 km west) and Beaulieu Road (10.9 km north). 4 stations lie within 10 km in all. Of the five, Lymington Town is the most punctual at 97.4% and Beaulieu Road the least at 71.2%, with Lymington Pier on 95.8%.
Lymington Pier is named after Lymington, a town, home to about 15,726 people, but the station stands 1.7 km from its centre.
Lymington Pier is among the most punctual stations in Britain. Its 95.8% puts it 95th out of 2,374 ranked stations, with 94 ahead of it and 2,279 behind, and 11.9 percentage points above the national median of 83.9%.
1 of 3 stations of a similar size in South East are more punctual than Lymington Pier on 95.8%. The comparison group includes Lymington Town (97.4%), Beltring (94.7%) and East Farleigh (95.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 22,510 | 95.8% | 3.8% |
Operators with their own page for this station are linked to it.
Late train at Lymington Pier? Delay Repay
These operators call at Lymington Pier and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,680 | 98.4% | 2.6% |
| Period 6 of 2026-27 | 1,800 | 93.9% | 3.2% |
| Period 5 of 2026-27 | 1,800 | 98.1% | 2.4% |
| Period 4 of 2026-27 | 1,800 | 96.7% | 4.8% |
| Period 3 of 2026-27 | 1,794 | 96.8% | 4.8% |
| Period 2 of 2026-27 | 1,800 | 98.2% | 3.8% |
| Period 1 of 2026-27 | 2,010 | 99.1% | 1.3% |
| Period 13 of 2025-26 | 1,986 | 97.1% | 3.6% |
| Period 12 of 2025-26 | 1,626 | 98.4% | 1.9% |
| Period 11 of 2025-26 | 1,142 | 81.3% | 6.0% |
| Period 10 of 2025-26 | 1,526 | 89.1% | 8.1% |
| Period 9 of 2025-26 | 1,800 | 96.0% | 3.0% |
| Period 8 of 2025-26 | 1,746 | 95.3% | 5.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lymington Town | 22,510 | 97.4% | 3.8% |
| Beltring | 22,703 | 94.7% | 1.8% |
| East Farleigh | 22,703 | 95.0% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out