Beltring
BEGSouth EastManaged by Southeastern
How this station is performing
Beltring had 22,703 scheduled stops to Period 7 of 2026-27, about 62 a day. 94.7% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Beltring opened on 1 September 1909, 117 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Beltring is the newest; the oldest, Paddock Wood, opened in 1842.
The nearest stations to Beltring are Yalding (2.5 km north), Paddock Wood (2.7 km south), Wateringbury (5.2 km north), Marden (Kent) (7.0 km south-east) and East Farleigh (8.0 km north-east). 8 stations lie within 10 km in all. Of the five, Yalding is the most punctual at 95.3% and Marden (Kent) the least at 72.8%, with Beltring on 94.7%.
Beltring takes its name from a Village called Beltring, and the station stands 0.4 km from its centre.
In South East, Beltring ranks 26th of 409 ranked stations. Its 94.7% is 13.5 percentage points better than the area median of 81.2%.
Compared with 3 stations of a similar size in South East, Beltring is the least punctual, at 94.7%. All of them are ahead, including East Farleigh (95.0%), Wateringbury (95.1%) and Yalding (95.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 22,703 | 94.7% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Beltring? Delay Repay
These operators call at Beltring and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,780 | 93.5% | 1.1% |
| Period 6 of 2026-27 | 1,683 | 94.3% | 1.5% |
| Period 5 of 2026-27 | 1,686 | 95.8% | 2.8% |
| Period 4 of 2026-27 | 1,780 | 96.7% | 1.6% |
| Period 3 of 2026-27 | 1,720 | 92.9% | 2.0% |
| Period 2 of 2026-27 | 1,716 | 95.2% | 1.3% |
| Period 1 of 2026-27 | 2,013 | 97.2% | 0.7% |
| Period 13 of 2025-26 | 1,892 | 95.8% | 2.9% |
| Period 12 of 2025-26 | 1,720 | 95.1% | 0.6% |
| Period 11 of 2025-26 | 1,747 | 95.7% | 1.2% |
| Period 10 of 2025-26 | 1,499 | 93.8% | 1.3% |
| Period 9 of 2025-26 | 1,687 | 90.8% | 3.8% |
| Period 8 of 2025-26 | 1,780 | 93.8% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Farleigh | 22,703 | 95.0% | 1.8% |
| Wateringbury | 22,703 | 95.1% | 1.8% |
| Yalding | 22,703 | 95.3% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out