GTR at Luton Airport Parkway
All trains at Luton Airport ParkwayGTR across BritainEast of England
How this operator is doing here
GTR had 77,230 scheduled stops at Luton Airport Parkway in the 13 periods to Period 7 of 2026-27, 76% of the station's total. 79.5% of recorded arrivals came within three minutes and 5.1% of stops were cancelled.
GTR trains at Luton Airport Parkway also serve Luton (1.6 km north-west, 82.8% on time, 5.1% cancelled), Leagrave (5.6 km north-west, 85.5% on time, 6.1% cancelled), Harpenden (7.1 km south-east, 80.1% on time, 5.7% cancelled), Harlington (Bedfordshire) (12.0 km north-west, 84.6% on time, 6.1% cancelled), Hitchin (12.8 km north-east, 77.3% on time, 6.9% cancelled) and Stevenage (13.4 km east, 80.7% on time, 6.1% cancelled), which are the stations on its network closest to Luton Airport Parkway.
Within 30 km of here, GTR runs best at Cuffley, 26.8 km south-east (92.1%), and worst at Elstree and Borehamwood, 25.7 km south (70.9%).
The busiest GTR station within 30 km of Luton Airport Parkway is St Albans City, 14.4 km south, with about 329 scheduled stops a day.
Of the 2 operators with enough records at Luton Airport Parkway, GTR is the most punctual, at 79.5%.
For GTR, Luton Airport Parkway is the 213th best of 307 ranked stations. Its 79.5% here is 3.4 percentage points below the 82.9% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,232 | 78.1% | 3.4% |
| Period 6 of 2026-27 | 5,973 | 75.0% | 5.8% |
| Period 5 of 2026-27 | 5,454 | 74.5% | 7.8% |
| Period 4 of 2026-27 | 5,865 | 75.2% | 6.1% |
| Period 3 of 2026-27 | 4,431 | 81.1% | 3.1% |
| Period 2 of 2026-27 | 5,602 | 84.1% | 3.5% |
| Period 1 of 2026-27 | 6,584 | 84.9% | 3.2% |
| Period 13 of 2025-26 | 6,838 | 82.3% | 2.7% |
| Period 12 of 2025-26 | 6,175 | 83.2% | 6.2% |
| Period 11 of 2025-26 | 6,216 | 80.1% | 5.8% |
| Period 10 of 2025-26 | 5,556 | 82.7% | 6.1% |
| Period 9 of 2025-26 | 6,211 | 74.2% | 8.8% |
| Period 8 of 2025-26 | 6,093 | 77.6% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Luton Airport Parkway
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 24,414 | 72.0% | 6.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out