Luton Airport Parkway
LTNEast of EnglandManaged by Govia Thameslink Railway (Thameslink)
How this station is performing
Luton Airport Parkway had 101,644 scheduled stops to Period 7 of 2026-27, about 279 a day. 77.7% of recorded arrivals were within three minutes of the timetable and 5.3% of scheduled stops were cancelled.
Luton Airport Parkway opened on 21 November 1999, 27 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Luton Airport Parkway is the newest; the oldest, Hitchin, opened in 1850.
The nearest stations to Luton Airport Parkway are Luton (1.6 km north-west), Leagrave (5.6 km north-west), Harpenden (7.1 km south-east), Harlington (Bedfordshire) (12.0 km north-west) and Hitchin (12.8 km north-east). 3 stations lie within 10 km in all. Of the five, Leagrave is the most punctual at 85.5% and Hitchin the least at 77.3%, with Luton Airport Parkway on 77.7%.
Luton Airport Parkway is a parkway station, 1.4 km from the centre of Luton, a town, home to about 213,052 people, which gives it its name.
2 operators call at Luton Airport Parkway: GTR (79.5%, 76% of stops) and East Midlands Railway (72.0%, 24% of stops). The operator you travel with matters: GTR reaches 79.5% within three minutes while East Midlands Railway manages 72.0%, a gap of 7.5 percentage points.
2 of 3 stations of a similar size in East of England are more punctual than Luton Airport Parkway on 77.7%. The comparison group includes Luton (80.1%), Peterborough (70.0%) and Cheshunt (88.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 77,230 | 79.5% | 5.1% |
| East Midlands Railway | 24,414 | 72.0% | 6.1% |
Operators with their own page for this station are linked to it.
Late train at Luton Airport Parkway? Delay Repay
These operators call at Luton Airport Parkway and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,174 | 76.7% | 4.1% |
| Period 6 of 2026-27 | 7,793 | 74.7% | 5.4% |
| Period 5 of 2026-27 | 7,250 | 72.9% | 9.2% |
| Period 4 of 2026-27 | 7,763 | 74.5% | 5.9% |
| Period 3 of 2026-27 | 5,737 | 80.0% | 3.3% |
| Period 2 of 2026-27 | 7,434 | 81.2% | 4.0% |
| Period 1 of 2026-27 | 8,688 | 82.7% | 3.5% |
| Period 13 of 2025-26 | 8,981 | 80.0% | 4.8% |
| Period 12 of 2025-26 | 8,131 | 80.4% | 6.1% |
| Period 11 of 2025-26 | 8,158 | 78.6% | 6.6% |
| Period 10 of 2025-26 | 7,334 | 80.7% | 5.3% |
| Period 9 of 2025-26 | 8,167 | 72.3% | 7.7% |
| Period 8 of 2025-26 | 8,034 | 75.4% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Luton | 103,732 | 80.1% | 5.4% |
| Peterborough | 103,878 | 70.0% | 3.3% |
| Cheshunt | 103,951 | 88.0% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out