How this operator is doing here
East Midlands Railway had 24,414 scheduled stops at Luton Airport Parkway in the 13 periods to Period 7 of 2026-27, 24% of the station's total. 72.0% of recorded arrivals came within three minutes and 6.1% of stops were cancelled.
East Midlands Railway trains at Luton Airport Parkway also serve Luton (1.6 km north-west, 70.7% on time, 6.5% cancelled), St Albans City (14.4 km south, – on time, – cancelled), Flitwick (16.0 km north-west, – on time, – cancelled), Bedford (29.8 km north, 76.2% on time, 6.3% cancelled), Hendon (34.3 km south, – on time, – cancelled) and Cricklewood (37.1 km south, – on time, – cancelled), which are the stations on its network closest to Luton Airport Parkway.
The busiest East Midlands Railway station within 30 km of Luton Airport Parkway is Bedford, 29.8 km north, with about 71 scheduled stops a day.
Of the 2 operators with enough records at Luton Airport Parkway, East Midlands Railway is the least punctual, at 72.0%.
East Midlands Railway at Luton Airport Parkway has slipped a little, from 74.7% within three minutes in the previous 13 periods to 72.0% in the latest 13, a fall of 2.7 percentage points. Cancellations rose to 6.1% of scheduled stops from 3.7%, which is 2.4 percentage points more.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,942 | 71.8% | 6.5% |
| Period 6 of 2026-27 | 1,820 | 73.7% | 4.0% |
| Period 5 of 2026-27 | 1,796 | 67.5% | 13.5% |
| Period 4 of 2026-27 | 1,898 | 72.2% | 5.1% |
| Period 3 of 2026-27 | 1,306 | 76.3% | 3.9% |
| Period 2 of 2026-27 | 1,832 | 72.2% | 5.5% |
| Period 1 of 2026-27 | 2,104 | 75.4% | 4.5% |
| Period 13 of 2025-26 | 2,143 | 72.0% | 11.5% |
| Period 12 of 2025-26 | 1,956 | 71.5% | 5.6% |
| Period 11 of 2025-26 | 1,942 | 73.7% | 9.1% |
| Period 10 of 2025-26 | 1,778 | 74.7% | 2.9% |
| Period 9 of 2025-26 | 1,956 | 66.9% | 4.2% |
| Period 8 of 2025-26 | 1,941 | 68.8% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Luton Airport Parkway
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 77,230 | 79.5% | 5.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out