Southeastern at Loughborough Junction
All trains at Loughborough JunctionSoutheastern across BritainLondon
How this operator is doing here
Southeastern had 1,743 scheduled stops at Loughborough Junction in the 13 periods to Period 7 of 2026-27, 4% of the station's total. 90.2% of recorded arrivals came within three minutes and 2.2% of stops were cancelled.
Southeastern trains at Loughborough Junction also serve Brixton (0.9 km south-west, 84.3% on time, 2.8% cancelled), Denmark Hill (0.9 km east, 83.8% on time, 2.3% cancelled), Herne Hill (1.4 km south, 80.8% on time, 2.4% cancelled), Peckham Rye (2.3 km east, 81.3% on time, 2.0% cancelled), West Dulwich (3.0 km south, 81.3% on time, 2.6% cancelled) and Elephant and Castle (3.1 km north, 86.0% on time, 2.5% cancelled), which are the stations on its network closest to Loughborough Junction.
Within 30 km of here, Southeastern runs best at Sundridge Park, 10.4 km south-east (99.4%), and worst at Sevenoaks, 28.9 km south-east (72.3%).
The busiest Southeastern station within 30 km of Loughborough Junction is London Bridge, 4.5 km north, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Loughborough Junction, Southeastern is the most punctual, at 90.2%.
For Southeastern, Loughborough Junction is the 37th best of 173 ranked stations. Its 90.2% here is 6.0 percentage points above the 84.2% across the whole network.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 140 | 88.6% | 0.0% |
| Period 6 of 2026-27 | 133 | 90.9% | 0.8% |
| Period 5 of 2026-27 | 139 | 90.6% | 0.7% |
| Period 4 of 2026-27 | 139 | 92.6% | 2.9% |
| Period 3 of 2026-27 | 140 | 91.0% | 5.0% |
| Period 2 of 2026-27 | 126 | 92.4% | 6.3% |
| Period 1 of 2026-27 | 147 | 91.8% | 0.0% |
| Period 13 of 2025-26 | 150 | 93.9% | 0.7% |
| Period 12 of 2025-26 | 139 | 95.6% | 2.2% |
| Period 11 of 2025-26 | 140 | 92.0% | 2.1% |
| Period 10 of 2025-26 | 70 | 83.8% | 2.9% |
| Period 9 of 2025-26 | 140 | 81.8% | 2.1% |
| Period 8 of 2025-26 | 140 | 84.3% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Loughborough Junction
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 47,856 | 82.9% | 8.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out