Loughborough Junction
LGJLondonManaged by Govia Thameslink Railway (Thameslink)
How this station is performing
Loughborough Junction had 49,599 scheduled stops to Period 7 of 2026-27, about 136 a day. 83.2% of recorded arrivals were within three minutes of the timetable and 8.0% of scheduled stops were cancelled.
The nearest stations to Loughborough Junction are Brixton (0.9 km south-west), Denmark Hill (0.9 km east), Herne Hill (1.4 km south), East Dulwich (1.6 km east) and North Dulwich (1.6 km south-east). 131 stations lie within 10 km in all. Of the five, East Dulwich is the most punctual at 96.0% and Herne Hill the least at 81.3%, with Loughborough Junction on 83.2%.
Loughborough Junction takes its name from an area of London called Loughborough Junction, and the station stands 0.0 km from its centre.
Cancellations are a particular problem at Loughborough Junction. 8.0% of scheduled stops did not happen, 3.0 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2338th of 2,374.
2 operators call at Loughborough Junction: GTR (82.9%, 96% of stops) and Southeastern (90.2%, 4% of stops). The operator you travel with matters: Southeastern reaches 90.2% within three minutes while GTR manages 82.9%, a gap of 7.3 percentage points.
Compared with 3 stations of a similar size in London, Loughborough Junction is the least punctual, at 83.2%. All of them are ahead, including Wandsworth Road (92.5%), Clapham High Street (92.4%) and Barking Riverside (96.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 47,856 | 82.9% | 8.3% |
| Southeastern | 1,743 | 90.2% | 2.2% |
Operators with their own page for this station are linked to it.
Late train at Loughborough Junction? Delay Repay
These operators call at Loughborough Junction and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,942 | 78.9% | 5.6% |
| Period 6 of 2026-27 | 3,938 | 77.7% | 10.1% |
| Period 5 of 2026-27 | 3,937 | 76.8% | 11.2% |
| Period 4 of 2026-27 | 3,991 | 84.1% | 5.8% |
| Period 3 of 2026-27 | 3,396 | 82.7% | 9.3% |
| Period 2 of 2026-27 | 3,427 | 86.8% | 5.0% |
| Period 1 of 2026-27 | 4,239 | 87.0% | 6.4% |
| Period 13 of 2025-26 | 4,204 | 88.2% | 6.4% |
| Period 12 of 2025-26 | 4,040 | 86.8% | 5.9% |
| Period 11 of 2025-26 | 3,952 | 82.3% | 8.1% |
| Period 10 of 2025-26 | 2,835 | 85.3% | 13.3% |
| Period 9 of 2025-26 | 3,813 | 81.1% | 13.1% |
| Period 8 of 2025-26 | 3,885 | 83.5% | 5.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Wandsworth Road | 49,632 | 92.5% | 4.5% |
| Clapham High Street | 49,636 | 92.4% | 4.5% |
| Barking Riverside | 49,411 | 96.7% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out