GTR at Loughborough Junction
How this operator is doing here
GTR had 47,856 scheduled stops at Loughborough Junction in the 13 periods to Period 7 of 2026-27, 96% of the station's total. 82.9% of recorded arrivals came within three minutes and 8.3% of stops were cancelled.
GTR trains at Loughborough Junction also serve Denmark Hill (0.9 km east, 86.8% on time, 4.0% cancelled), Herne Hill (1.4 km south, 81.7% on time, 8.2% cancelled), East Dulwich (1.6 km east, 96.0% on time, 2.6% cancelled), North Dulwich (1.6 km south-east, 95.2% on time, 2.6% cancelled), Peckham Rye (2.3 km east, 91.6% on time, 3.2% cancelled) and Tulse Hill (3.0 km south, 89.6% on time, 5.4% cancelled), which are the stations on its network closest to Loughborough Junction.
Within 30 km of here, GTR runs best at Birkbeck, 7.6 km south-east (98.1%), and worst at Kenley, 15.8 km south (66.9%).
The busiest GTR station within 30 km of Loughborough Junction is East Croydon, 10.1 km south, with about 813 scheduled stops a day.
GTR at Loughborough Junction has slipped a little, from 86.6% within three minutes in the previous 13 periods to 82.9% in the latest 13, a fall of 3.7 percentage points. Cancellations fell to 8.3% of scheduled stops from 8.8%, which is 0.5 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,802 | 78.5% | 5.8% |
| Period 6 of 2026-27 | 3,805 | 77.2% | 10.4% |
| Period 5 of 2026-27 | 3,798 | 76.2% | 11.6% |
| Period 4 of 2026-27 | 3,852 | 83.8% | 5.9% |
| Period 3 of 2026-27 | 3,256 | 82.4% | 9.5% |
| Period 2 of 2026-27 | 3,301 | 86.6% | 5.0% |
| Period 1 of 2026-27 | 4,092 | 86.9% | 6.6% |
| Period 13 of 2025-26 | 4,054 | 87.9% | 6.6% |
| Period 12 of 2025-26 | 3,901 | 86.5% | 6.1% |
| Period 11 of 2025-26 | 3,812 | 81.9% | 8.4% |
| Period 10 of 2025-26 | 2,765 | 85.3% | 13.6% |
| Period 9 of 2025-26 | 3,673 | 81.0% | 13.5% |
| Period 8 of 2025-26 | 3,745 | 83.4% | 6.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Loughborough Junction
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 1,743 | 90.2% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out