Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

GTR at Loughborough Junction

All trains at Loughborough JunctionGTR across BritainLondon

On time, last 13 periods82.9%Whole station: 83.2%
Cancelled8.3%Whole station: 8.0%
Scheduled stops47,856Of 49,599 at the station

How this operator is doing here

GTR had 47,856 scheduled stops at Loughborough Junction in the 13 periods to Period 7 of 2026-27, 96% of the station's total. 82.9% of recorded arrivals came within three minutes and 8.3% of stops were cancelled.

GTR trains at Loughborough Junction also serve Denmark Hill (0.9 km east, 86.8% on time, 4.0% cancelled), Herne Hill (1.4 km south, 81.7% on time, 8.2% cancelled), East Dulwich (1.6 km east, 96.0% on time, 2.6% cancelled), North Dulwich (1.6 km south-east, 95.2% on time, 2.6% cancelled), Peckham Rye (2.3 km east, 91.6% on time, 3.2% cancelled) and Tulse Hill (3.0 km south, 89.6% on time, 5.4% cancelled), which are the stations on its network closest to Loughborough Junction.

Within 30 km of here, GTR runs best at Birkbeck, 7.6 km south-east (98.1%), and worst at Kenley, 15.8 km south (66.9%).

The busiest GTR station within 30 km of Loughborough Junction is East Croydon, 10.1 km south, with about 813 scheduled stops a day.

GTR at Loughborough Junction has slipped a little, from 86.6% within three minutes in the previous 13 periods to 82.9% in the latest 13, a fall of 3.7 percentage points. Cancellations fell to 8.3% of scheduled stops from 8.8%, which is 0.5 percentage points fewer.

Period by period

70%80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 93.3%Period 2 of 2023-24: 94.6%Period 3 of 2023-24: 89.9%Period 4 of 2023-24: 95.1%Period 5 of 2023-24: 93.7%Period 6 of 2023-24: 91.6%Period 7 of 2023-24: 92.1%Period 8 of 2023-24: 90.9%Period 9 of 2023-24: 86.4%Period 10 of 2023-24: 85.5%Period 11 of 2023-24: 85.3%Period 12 of 2023-24: 89.7%Period 13 of 2023-24: 88.8%Period 1 of 2024-25: 90.8%Period 2 of 2024-25: 88.2%Period 3 of 2024-25: 87.4%Period 4 of 2024-25: 86.2%Period 5 of 2024-25: 88.5%Period 6 of 2024-25: 89.2%Period 7 of 2024-25: 85.3%Period 8 of 2024-25: 84.6%Period 9 of 2024-25: 80.6%Period 10 of 2024-25: 83.6%Period 11 of 2024-25: 86.6%Period 12 of 2024-25: 90.2%Period 13 of 2024-25: 88.3%Period 1 of 2025-26: 88.6%Period 2 of 2025-26: 89.9%Period 3 of 2025-26: 85.7%Period 4 of 2025-26: 87.7%Period 5 of 2025-26: 87.0%Period 6 of 2025-26: 85.3%Period 7 of 2025-26: 86.2%Period 8 of 2025-26: 83.4%Period 9 of 2025-26: 81.0%Period 10 of 2025-26: 85.3%Period 11 of 2025-26: 81.9%Period 12 of 2025-26: 86.5%Period 13 of 2025-26: 87.9%Period 1 of 2026-27: 86.9%Period 2 of 2026-27: 86.6%Period 3 of 2026-27: 82.4%Period 4 of 2026-27: 83.8%Period 5 of 2026-27: 76.2%Period 6 of 2026-27: 77.2%Period 7 of 2026-27: 78.5%
This pageGreat Britain
0%5%10%15%20%Period 1 of 2023-24: 4.5%Period 2 of 2023-24: 1.7%Period 3 of 2023-24: 7.9%Period 4 of 2023-24: 7.2%Period 5 of 2023-24: 5.5%Period 6 of 2023-24: 5.3%Period 7 of 2023-24: 8.0%Period 8 of 2023-24: 4.6%Period 9 of 2023-24: 7.8%Period 10 of 2023-24: 14.1%Period 11 of 2023-24: 6.3%Period 12 of 2023-24: 3.1%Period 13 of 2023-24: 7.3%Period 1 of 2024-25: 7.3%Period 2 of 2024-25: 5.8%Period 3 of 2024-25: 6.4%Period 4 of 2024-25: 7.0%Period 5 of 2024-25: 7.6%Period 6 of 2024-25: 9.1%Period 7 of 2024-25: 11.2%Period 8 of 2024-25: 8.7%Period 9 of 2024-25: 16.6%Period 10 of 2024-25: 14.0%Period 11 of 2024-25: 5.5%Period 12 of 2024-25: 6.5%Period 13 of 2024-25: 7.9%Period 1 of 2025-26: 6.0%Period 2 of 2025-26: 3.4%Period 3 of 2025-26: 8.7%Period 4 of 2025-26: 8.3%Period 5 of 2025-26: 12.6%Period 6 of 2025-26: 8.2%Period 7 of 2025-26: 8.8%Period 8 of 2025-26: 6.0%Period 9 of 2025-26: 13.5%Period 10 of 2025-26: 13.6%Period 11 of 2025-26: 8.4%Period 12 of 2025-26: 6.1%Period 13 of 2025-26: 6.6%Period 1 of 2026-27: 6.6%Period 2 of 2026-27: 5.0%Period 3 of 2026-27: 9.5%Period 4 of 2026-27: 5.9%Period 5 of 2026-27: 11.6%Period 6 of 2026-27: 10.4%Period 7 of 2026-27: 5.8%2023-242024-252025-262026-27

See how GTR Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-273,80278.5%5.8%
Period 6 of 2026-273,80577.2%10.4%
Period 5 of 2026-273,79876.2%11.6%
Period 4 of 2026-273,85283.8%5.9%
Period 3 of 2026-273,25682.4%9.5%
Period 2 of 2026-273,30186.6%5.0%
Period 1 of 2026-274,09286.9%6.6%
Period 13 of 2025-264,05487.9%6.6%
Period 12 of 2025-263,90186.5%6.1%
Period 11 of 2025-263,81281.9%8.4%
Period 10 of 2025-262,76585.3%13.6%
Period 9 of 2025-263,67381.0%13.5%
Period 8 of 2025-263,74583.4%6.0%

Time of year

75%80%85%90%95%P1: 89.8%1P2: 89.8%2P3: 86.3%3P4: 88.0%4P5: 86.2%5P6: 85.6%6P7: 85.2%7P8: 86.3%8P9: 82.7%9P10: 84.9%10P11: 84.6%11P12: 88.8%12P13: 88.3%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Loughborough Junction

OperatorScheduled stopsWithin 3 minCancelled
Southeastern1,74390.2%2.2%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out