Wandsworth Road
WWRLondonManaged by London Overground
How this station is performing
Wandsworth Road had 49,632 scheduled stops to Period 7 of 2026-27, about 136 a day. 92.5% of recorded arrivals were within three minutes of the timetable and 4.5% of scheduled stops were cancelled.
Wandsworth Road opened on 1 May 1867, 159 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Vauxhall is the oldest (1838) and Queenstown Road (Battersea) the newest (1877), with Wandsworth Road in between.
The nearest stations to Wandsworth Road are Clapham High Street (0.6 km south-east), Queenstown Road (Battersea) (0.8 km north-west), Battersea Park (1.1 km north-west), Brixton (1.9 km south-east) and Vauxhall (2.1 km north-east). 137 stations lie within 10 km in all. Of the five, Battersea Park is the most punctual at 94.1% and Vauxhall the least at 84.2%, with Wandsworth Road on 92.5%.
For Wandsworth Road, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 90.4% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2024-25, at 97.1%, which is 6.7 percentage points higher. Cancellations peaked at 9.5% of scheduled stops in Period 2 of 2026-27, against 4.5% over the latest 13 periods.
1 of 3 stations of a similar size in London are more punctual than Wandsworth Road on 92.5%. The comparison group includes Clapham High Street (92.4%), Loughborough Junction (83.2%) and Blackhorse Road (94.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 49,632 | 92.5% | 4.5% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,845 | 91.3% | 4.2% |
| Period 6 of 2026-27 | 3,302 | 90.9% | 7.5% |
| Period 5 of 2026-27 | 3,941 | 92.1% | 8.1% |
| Period 4 of 2026-27 | 3,856 | 91.1% | 6.1% |
| Period 3 of 2026-27 | 3,995 | 90.7% | 2.3% |
| Period 2 of 2026-27 | 3,707 | 92.4% | 9.5% |
| Period 1 of 2026-27 | 4,565 | 94.2% | 4.6% |
| Period 13 of 2025-26 | 3,969 | 95.0% | 3.1% |
| Period 12 of 2025-26 | 3,871 | 94.6% | 2.0% |
| Period 11 of 2025-26 | 3,980 | 93.1% | 4.0% |
| Period 10 of 2025-26 | 2,965 | 93.5% | 2.3% |
| Period 9 of 2025-26 | 3,740 | 90.4% | 2.4% |
| Period 8 of 2025-26 | 3,896 | 92.8% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Clapham High Street | 49,636 | 92.4% | 4.5% |
| Loughborough Junction | 49,599 | 83.2% | 8.0% |
| Blackhorse Road | 49,803 | 94.5% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out