Retford
RETEast MidlandsManaged by London North Eastern Railway
How this station is performing
Retford had 27,004 scheduled stops to Period 7 of 2026-27, about 74 a day. 75.3% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Retford opened on 17 July 1849. It was moved to the site it uses now on 15 July 1852. Of the 5 stations nearest to it with a known opening date, Retford is the oldest; the next oldest, Worksop, dates from 1849.
Retford is remote: its nearest neighbours are Worksop (11.8 km west), Gainsborough Lea Road (14.2 km north-east), Shireoaks (14.8 km west), Gainsborough Central (15.0 km north-east) and Whitwell (Derbyshire) (17.3 km west). At 75.3%, Retford is less punctual than all of them; the best of the five, Worksop, manages 83.5%.
Retford is one of 2 stations named after a market town called Retford, home to about 24,000 people; this one stands 0.5 km from its centre.
3 operators call at Retford: Northern (80.3%, 51% of stops), LNER (72.6%, 32% of stops) and Hull Trains (65.4%, 17% of stops). The operator you travel with matters: Northern reaches 80.3% within three minutes while Hull Trains manages 65.4%, a gap of 14.9 percentage points.
2 of 3 stations of a similar size in East Midlands are more punctual than Retford on 75.3%. The comparison group includes Long Buckby (73.7%), Wellingborough (79.2%) and Worksop (83.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 13,895 | 80.3% | 2.2% |
| LNER | 8,533 | 72.6% | 3.5% |
| Hull Trains | 4,576 | 65.4% | 0.8% |
Operators with their own page for this station are linked to it.
Late train at Retford? Delay Repay
These operators call at Retford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,086 | 75.6% | 1.6% |
| Period 6 of 2026-27 | 2,069 | 74.0% | 2.6% |
| Period 5 of 2026-27 | 2,096 | 73.3% | 2.8% |
| Period 4 of 2026-27 | 2,092 | 74.8% | 3.3% |
| Period 3 of 2026-27 | 2,075 | 72.8% | 2.2% |
| Period 2 of 2026-27 | 2,088 | 74.6% | 2.8% |
| Period 1 of 2026-27 | 2,398 | 77.6% | 2.7% |
| Period 13 of 2025-26 | 2,283 | 80.2% | 1.6% |
| Period 12 of 2025-26 | 1,794 | 74.3% | 1.8% |
| Period 11 of 2025-26 | 2,083 | 77.0% | 2.6% |
| Period 10 of 2025-26 | 1,881 | 76.6% | 2.7% |
| Period 9 of 2025-26 | 2,015 | 71.2% | 2.3% |
| Period 8 of 2025-26 | 2,044 | 76.3% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Long Buckby | 26,480 | 73.7% | 5.0% |
| Wellingborough | 26,306 | 79.2% | 6.1% |
| Worksop | 25,133 | 83.5% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out