London Blackfriars
BFRLondonManaged by Govia Thameslink Railway (Thameslink)
How this station is performing
London Blackfriars had 204,825 scheduled stops to Period 7 of 2026-27, about 563 a day. 80.5% of recorded arrivals were within three minutes of the timetable and 5.3% of scheduled stops were cancelled.
London Blackfriars opened on 10 May 1886, 140 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, London Waterloo is the oldest (1848) and City Thameslink the newest (1990), with London Blackfriars in between.
The nearest stations to London Blackfriars are City Thameslink (0.5 km north), London Waterloo East (0.8 km south-west), London Cannon Street (0.9 km east), Farringdon (1.0 km north) and London Waterloo (1.1 km south-west). 141 stations lie within 10 km in all. Of the five, London Cannon Street is the most punctual at 89.3% and City Thameslink the least at 77.2%, with London Blackfriars on 80.5%.
London Blackfriars is named after London, a city, home to about 8,799,728 people, but the station stands 1.7 km from its centre.
2 operators call at London Blackfriars: GTR (80.4%, 97% of stops) and Southeastern (86.9%, 3% of stops). The operator you travel with matters: Southeastern reaches 86.9% within three minutes while GTR manages 80.4%, a gap of 6.5 percentage points.
Compared with 3 stations of a similar size in London, London Blackfriars is the least punctual, at 80.5%. All of them are ahead, including Wimbledon (82.8%), Canada Water (91.6%) and London Charing Cross (84.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 199,652 | 80.4% | 5.4% |
| Southeastern | 5,173 | 86.9% | 2.9% |
Operators with their own page for this station are linked to it.
Late train at London Blackfriars? Delay Repay
These operators call at London Blackfriars and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 16,465 | 75.5% | 3.1% |
| Period 6 of 2026-27 | 15,967 | 75.5% | 6.6% |
| Period 5 of 2026-27 | 16,902 | 76.4% | 6.8% |
| Period 4 of 2026-27 | 16,214 | 78.5% | 6.1% |
| Period 3 of 2026-27 | 13,074 | 79.5% | 5.2% |
| Period 2 of 2026-27 | 14,090 | 84.8% | 4.5% |
| Period 1 of 2026-27 | 17,527 | 86.8% | 4.0% |
| Period 13 of 2025-26 | 17,571 | 85.7% | 2.8% |
| Period 12 of 2025-26 | 16,198 | 84.0% | 5.4% |
| Period 11 of 2025-26 | 15,531 | 81.9% | 4.7% |
| Period 10 of 2025-26 | 12,950 | 82.0% | 6.8% |
| Period 9 of 2025-26 | 16,316 | 76.5% | 9.3% |
| Period 8 of 2025-26 | 16,020 | 79.3% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Wimbledon | 204,294 | 82.8% | 5.4% |
| Canada Water | 207,465 | 91.6% | 3.8% |
| London Charing Cross | 201,825 | 84.9% | 2.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out