Heathrow Express at London Paddington
All trains at London PaddingtonHeathrow Express across BritainLondon
How this operator is doing here
Heathrow Express had 53,881 scheduled stops at London Paddington in the 13 periods to Period 7 of 2026-27, 13% of the station's total. 89.5% of recorded arrivals came within three minutes and 3.8% of stops were cancelled.
Heathrow Express trains at London Paddington also serve Ealing Broadway (8.6 km west, – on time, – cancelled), Hayes and Harlington (16.8 km west, – on time, – cancelled), Heathrow Terminal 4 (Rail Station Only) (19.7 km west, 96.0% on time, 7.8% cancelled), Heathrow Terminals 2 and 3 (Rail Station Only) (19.8 km west, 87.8% on time, 4.0% cancelled) and Heathrow Terminal 5 (Rail Station Only) (22.1 km west, 91.3% on time, 3.8% cancelled), which are the stations on its network closest to London Paddington.
The busiest Heathrow Express station within 30 km of London Paddington is Heathrow Terminals 2 and 3 (Rail Station Only), 19.8 km west, with about 150 scheduled stops a day.
Heathrow Express ranks 2nd of the 3 operators with enough records at London Paddington, on 89.5%.
For Heathrow Express, London Paddington ranks 2nd of 3 stations and is typical: 89.5% here against 89.5% across the network, a difference of 0.0 percentage points.
Over three full railway years Heathrow Express at London Paddington has improved each time, from 86.7% within three minutes in 2023-24 to 88.4% in 2024-25 and 90.1% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,186 | 88.6% | 1.3% |
| Period 6 of 2026-27 | 3,727 | 82.5% | 5.2% |
| Period 5 of 2026-27 | 4,252 | 89.6% | 8.2% |
| Period 4 of 2026-27 | 4,216 | 89.2% | 1.4% |
| Period 3 of 2026-27 | 4,186 | 89.3% | 9.5% |
| Period 2 of 2026-27 | 4,174 | 90.4% | 3.5% |
| Period 1 of 2026-27 | 4,623 | 90.5% | 3.0% |
| Period 13 of 2025-26 | 4,476 | 92.4% | 1.6% |
| Period 12 of 2025-26 | 4,104 | 91.1% | 1.7% |
| Period 11 of 2025-26 | 4,132 | 91.1% | 5.1% |
| Period 10 of 2025-26 | 3,907 | 90.6% | 2.4% |
| Period 9 of 2025-26 | 3,839 | 90.2% | 4.2% |
| Period 8 of 2025-26 | 4,059 | 87.4% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at London Paddington
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 234,367 | 91.5% | 3.0% |
| Great Western Railway | 132,297 | 68.9% | 4.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out