Great Western Railway at London Paddington
All trains at London PaddingtonGreat Western Railway across BritainLondon
How this operator is doing here
Great Western Railway had 132,297 scheduled stops at London Paddington in the 13 periods to Period 7 of 2026-27, 31% of the station's total. 68.9% of recorded arrivals came within three minutes and 4.3% of stops were cancelled.
Great Western Railway trains at London Paddington also serve Ealing Broadway (8.6 km west, 84.2% on time, 3.4% cancelled), West Ealing (9.9 km west, 96.0% on time, 4.3% cancelled), Drayton Green (10.6 km west, 96.2% on time, 4.3% cancelled), Castle Bar Park (10.7 km west, 96.8% on time, 4.3% cancelled), South Greenford (11.2 km west, 97.3% on time, 4.3% cancelled) and Greenford (11.9 km west, 96.8% on time, 4.3% cancelled), which are the stations on its network closest to London Paddington.
Within 30 km of here, Great Western Railway runs best at South Greenford, 11.2 km west (97.3%), and worst at Ealing Broadway, 8.6 km west (84.2%).
The busiest Great Western Railway station within 30 km of London Paddington is Slough, 28.7 km west, with about 175 scheduled stops a day.
Of the 3 operators with enough records at London Paddington, Great Western Railway is the least punctual, at 68.9%.
Over three full railway years Great Western Railway at London Paddington has improved each time, from 64.8% within three minutes in 2023-24 to 69.4% in 2024-25 and 70.8% in 2025-26.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 10,055 | 69.5% | 3.2% |
| Period 6 of 2026-27 | 9,659 | 64.6% | 4.9% |
| Period 5 of 2026-27 | 10,288 | 64.1% | 7.1% |
| Period 4 of 2026-27 | 9,990 | 62.7% | 4.1% |
| Period 3 of 2026-27 | 10,021 | 66.4% | 6.1% |
| Period 2 of 2026-27 | 10,336 | 72.1% | 3.8% |
| Period 1 of 2026-27 | 11,816 | 73.5% | 3.9% |
| Period 13 of 2025-26 | 11,210 | 75.6% | 1.9% |
| Period 12 of 2025-26 | 9,923 | 74.2% | 2.2% |
| Period 11 of 2025-26 | 9,923 | 75.4% | 4.8% |
| Period 10 of 2025-26 | 8,518 | 68.0% | 5.0% |
| Period 9 of 2025-26 | 10,256 | 63.5% | 4.5% |
| Period 8 of 2025-26 | 10,302 | 64.1% | 4.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at London Paddington
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 234,367 | 91.5% | 3.0% |
| Heathrow Express | 53,881 | 89.5% | 3.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out