Elizabeth line at London Paddington
All trains at London PaddingtonElizabeth line across BritainLondon
How this operator is doing here
Elizabeth line had 234,367 scheduled stops at London Paddington in the 13 periods to Period 7 of 2026-27, 56% of the station's total. 91.5% of recorded arrivals came within three minutes and 3.0% of stops were cancelled.
Elizabeth line trains at London Paddington also serve Bond Street (2.1 km east, 92.2% on time, 2.6% cancelled), Tottenham Court Road (3.1 km east, 92.1% on time, 2.6% cancelled), Farringdon (5.0 km east, 92.4% on time, 2.6% cancelled), Acton Main Line (6.2 km west, 83.5% on time, 4.2% cancelled), London Liverpool Street (6.6 km east, 92.5% on time, 2.7% cancelled) and Whitechapel (8.1 km east, 92.2% on time, 2.6% cancelled), which are the stations on its network closest to London Paddington.
Within 30 km of here, Elizabeth line runs best at Abbey Wood, 20.8 km east (94.9%), and worst at Ealing Broadway, 8.6 km west (82.9%).
The busiest Elizabeth line station within 30 km of London Paddington is London Liverpool Street, 6.6 km east, with about 643 scheduled stops a day.
Of the 3 operators with enough records at London Paddington, Elizabeth line is the most punctual, at 91.5%.
Over three full railway years Elizabeth line at London Paddington has improved each time, from 84.9% within three minutes in 2023-24 to 91.0% in 2024-25 and 92.8% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 18,099 | 91.8% | 2.4% |
| Period 6 of 2026-27 | 17,794 | 90.0% | 3.3% |
| Period 5 of 2026-27 | 18,105 | 87.9% | 6.0% |
| Period 4 of 2026-27 | 17,954 | 91.5% | 2.4% |
| Period 3 of 2026-27 | 17,745 | 88.7% | 3.1% |
| Period 2 of 2026-27 | 17,849 | 92.3% | 3.0% |
| Period 1 of 2026-27 | 20,547 | 92.6% | 3.1% |
| Period 13 of 2025-26 | 19,278 | 92.9% | 2.3% |
| Period 12 of 2025-26 | 17,945 | 93.4% | 1.4% |
| Period 11 of 2025-26 | 18,097 | 92.2% | 3.3% |
| Period 10 of 2025-26 | 16,136 | 94.3% | 2.3% |
| Period 9 of 2025-26 | 17,027 | 91.0% | 2.7% |
| Period 8 of 2025-26 | 17,791 | 90.7% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at London Paddington
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 132,297 | 68.9% | 4.3% |
| Heathrow Express | 53,881 | 89.5% | 3.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out