Southeastern at London Bridge
All trains at London BridgeSoutheastern across BritainLondon
How this operator is doing here
Southeastern had 331,882 scheduled stops at London Bridge in the 13 periods to Period 7 of 2026-27, 57% of the station's total. 82.8% of recorded arrivals came within three minutes and 1.6% of stops were cancelled.
Southeastern trains at London Bridge also serve London Cannon Street (0.7 km north-west, 89.3% on time, 1.6% cancelled), London Blackfriars (1.4 km north-west, 86.9% on time, 2.9% cancelled), Elephant and Castle (1.5 km south-west, 86.0% on time, 2.5% cancelled), London Waterloo East (1.6 km west, 85.8% on time, 2.4% cancelled), London Charing Cross (2.7 km west, 84.9% on time, 2.4% cancelled) and Peckham Rye (4.0 km south, 81.3% on time, 2.0% cancelled), which are the stations on its network closest to London Bridge.
Within 30 km of here, Southeastern runs best at Sundridge Park, 12.5 km south-east (99.4%), and worst at London St Pancras International, 4.2 km north-west (77.9%).
The busiest Southeastern station within 30 km of London Bridge is London Charing Cross, 2.7 km west, with about 554 scheduled stops a day.
Of the 3 operators with enough records at London Bridge, Southeastern is the least punctual, at 82.8%.
For Southeastern, London Bridge is the 87th best of 173 ranked stations. Its 82.8% here is 1.4 percentage points below the 84.2% across the whole network.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 24,909 | 78.3% | 1.5% |
| Period 6 of 2026-27 | 26,028 | 76.9% | 1.6% |
| Period 5 of 2026-27 | 21,295 | 84.9% | 2.1% |
| Period 4 of 2026-27 | 26,288 | 82.7% | 1.4% |
| Period 3 of 2026-27 | 26,097 | 82.7% | 3.5% |
| Period 2 of 2026-27 | 24,562 | 84.5% | 1.8% |
| Period 1 of 2026-27 | 29,367 | 86.8% | 1.2% |
| Period 13 of 2025-26 | 28,790 | 86.5% | 1.5% |
| Period 12 of 2025-26 | 26,289 | 85.1% | 1.1% |
| Period 11 of 2025-26 | 25,166 | 82.8% | 1.1% |
| Period 10 of 2025-26 | 21,478 | 83.1% | 1.6% |
| Period 9 of 2025-26 | 25,990 | 78.6% | 1.4% |
| Period 8 of 2025-26 | 25,623 | 82.3% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at London Bridge
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 251,437 | 83.8% | 3.9% |
| London Overground | 56 | 96.4% | 0.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out