London Overground at London Bridge
All trains at London BridgeLondon Overground across BritainLondon
How this operator is doing here
London Overground had 56 scheduled stops at London Bridge in the 13 periods to Period 7 of 2026-27, 0% of the station's total. 96.4% of recorded arrivals came within three minutes and 0.0% of stops were cancelled.
London Overground trains at London Bridge also serve London Liverpool Street (1.5 km north, 93.1% on time, 1.9% cancelled), Wapping (2.0 km east, 92.2% on time, 3.7% cancelled), Shadwell (2.1 km east, 92.2% on time, 3.7% cancelled), Shoreditch High Street (2.2 km north, 92.0% on time, 3.9% cancelled), Rotherhithe (2.3 km east, 91.1% on time, 3.7% cancelled) and Whitechapel (2.4 km north-east, 89.8% on time, 3.7% cancelled), which are the stations on its network closest to London Bridge.
Within 30 km of here, London Overground runs best at Romford, 20.1 km north-east (99.7%), and worst at Finchley Road and Frognal, 8.5 km north-west (75.2%).
The busiest London Overground station within 30 km of London Bridge is Highbury and Islington, 4.8 km north, with about 593 scheduled stops a day.
Of the 3 operators with enough records at London Bridge, London Overground is the most punctual, at 96.4%.
London Overground cancels fewer trains at London Bridge than elsewhere: 0.0% of scheduled stops, against 4.9% across its network and 2.6% for every operator at the station.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 0 | – | – |
| Period 6 of 2026-27 | 0 | – | – |
| Period 5 of 2026-27 | 0 | – | – |
| Period 4 of 2026-27 | 0 | – | – |
| Period 3 of 2026-27 | 0 | – | – |
| Period 2 of 2026-27 | 0 | – | – |
| Period 1 of 2026-27 | 0 | – | – |
| Period 13 of 2025-26 | 56 | 96.4% | 0.0% |
| Period 12 of 2025-26 | 0 | – | – |
| Period 11 of 2025-26 | 0 | – | – |
| Period 10 of 2025-26 | 0 | – | – |
| Period 9 of 2025-26 | 0 | – | – |
| Period 8 of 2025-26 | 0 | – | – |
Other operators at London Bridge
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 331,882 | 82.8% | 1.6% |
| GTR | 251,437 | 83.8% | 3.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out