GTR at London Bridge
How this operator is doing here
GTR had 251,437 scheduled stops at London Bridge in the 13 periods to Period 7 of 2026-27, 43% of the station's total. 83.8% of recorded arrivals came within three minutes and 3.9% of stops were cancelled.
GTR trains at London Bridge also serve London Blackfriars (1.4 km north-west, 80.4% on time, 5.4% cancelled), Moorgate (1.5 km north, 89.1% on time, 4.9% cancelled), Elephant and Castle (1.5 km south-west, 85.6% on time, 5.8% cancelled), City Thameslink (1.7 km north-west, 77.2% on time, 5.8% cancelled), Farringdon (2.2 km north-west, 79.6% on time, 5.9% cancelled) and Old Street (2.3 km north, 90.2% on time, 4.9% cancelled), which are the stations on its network closest to London Bridge.
Within 30 km of here, GTR runs best at Beckenham Junction, 11.2 km south (98.1%), and worst at Kenley, 20.1 km south (66.9%).
The busiest GTR station within 30 km of London Bridge is East Croydon, 14.4 km south, with about 813 scheduled stops a day.
GTR ranks 2nd of the 3 operators with enough records at London Bridge, on 83.8%.
For GTR, London Bridge is the 153rd best of 307 ranked stations. Its 83.8% here is 0.9 percentage points above the 82.9% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 19,674 | 75.7% | 3.1% |
| Period 6 of 2026-27 | 18,422 | 78.1% | 5.3% |
| Period 5 of 2026-27 | 18,531 | 80.3% | 4.5% |
| Period 4 of 2026-27 | 19,128 | 82.3% | 4.8% |
| Period 3 of 2026-27 | 18,224 | 82.7% | 3.7% |
| Period 2 of 2026-27 | 18,984 | 87.4% | 3.7% |
| Period 1 of 2026-27 | 22,828 | 88.7% | 3.5% |
| Period 13 of 2025-26 | 21,308 | 88.7% | 1.9% |
| Period 12 of 2025-26 | 19,627 | 86.4% | 5.2% |
| Period 11 of 2025-26 | 19,007 | 85.8% | 3.2% |
| Period 10 of 2025-26 | 16,709 | 85.8% | 3.8% |
| Period 9 of 2025-26 | 19,526 | 82.2% | 5.3% |
| Period 8 of 2025-26 | 19,469 | 84.0% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at London Bridge
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 331,882 | 82.8% | 1.6% |
| London Overground | 56 | 96.4% | 0.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out