Liss
LISSouth EastManaged by South Western Railway
How this station is performing
Liss had 17,455 scheduled stops to Period 7 of 2026-27, about 48 a day. 78.9% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Liss opened on 1 January 1859, 167 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Liss is the newest; the oldest, Alton, opened in 1852.
The nearest stations to Liss are Petersfield (5.4 km south-west), Liphook (7.2 km north-east), Alton (13.1 km north-west), Haslemere (13.1 km east) and Bentley (Hampshire) (15.3 km north). 2 stations lie within 10 km in all. Of the five, Alton is the most punctual at 85.0% and Petersfield the least at 75.1%, with Liss on 78.9%.
Liss is one of 2 stations named after a Village called Liss, home to about 6,347 people; this one stands 0.1 km from its centre.
Across the whole run of data, the weakest four-week period for Liss was Period 9 of 2024-25, at 61.5%, some time before the latest year. The strongest was Period 6 of 2023-24, at 92.1%, and the two are 30.6 percentage points apart. Cancellations peaked at 7.0% of scheduled stops in Period 2 of 2026-27, against 3.3% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Liss is the most punctual, at 78.9%. The comparison group includes Liphook (77.5%), Chestfield and Swalecliffe (78.8%) and Hungerford (73.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 17,455 | 78.9% | 3.3% |
Operators with their own page for this station are linked to it.
Late train at Liss? Delay Repay
These operators call at Liss and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,439 | 72.0% | 3.6% |
| Period 6 of 2026-27 | 1,391 | 78.8% | 2.0% |
| Period 5 of 2026-27 | 1,396 | 80.3% | 3.0% |
| Period 4 of 2026-27 | 1,386 | 81.3% | 3.2% |
| Period 3 of 2026-27 | 1,358 | 85.2% | 3.2% |
| Period 2 of 2026-27 | 1,332 | 74.5% | 7.0% |
| Period 1 of 2026-27 | 1,542 | 87.7% | 3.3% |
| Period 13 of 2025-26 | 1,526 | 87.6% | 2.1% |
| Period 12 of 2025-26 | 1,315 | 82.0% | 3.4% |
| Period 11 of 2025-26 | 1,369 | 81.4% | 2.3% |
| Period 10 of 2025-26 | 1,203 | 70.5% | 4.5% |
| Period 9 of 2025-26 | 1,374 | 65.7% | 2.5% |
| Period 8 of 2025-26 | 824 | 73.0% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Liphook | 17,455 | 77.5% | 3.3% |
| Chestfield and Swalecliffe | 17,443 | 78.8% | 1.6% |
| Hungerford | 17,417 | 73.3% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out