Chestfield and Swalecliffe
CSWSouth EastManaged by Southeastern
How this station is performing
Chestfield and Swalecliffe had 17,443 scheduled stops to Period 7 of 2026-27, about 48 a day. 78.8% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Chestfield and Swalecliffe opened on 6 July 1930, 96 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Chestfield and Swalecliffe is the newest; the oldest, Canterbury West, opened in 1846.
The nearest stations to Chestfield and Swalecliffe are Whitstable (2.3 km west), Herne Bay (3.6 km east), Sturry (7.6 km south-east), Canterbury West (8.5 km south) and Canterbury East (9.6 km south). 5 stations lie within 10 km in all. At 78.8%, Chestfield and Swalecliffe is more punctual than every one of them; the best of the five, Sturry, manages 78.5%.
Chestfield and Swalecliffe is named after Chestfield, a Village, home to about 3,214 people, but the station stands 0.6 km from its centre.
Across the whole run of data, the weakest four-week period for Chestfield and Swalecliffe was Period 9 of 2024-25, at 65.0%, some time before the latest year. The strongest was Period 2 of 2023-24, at 90.1%, and the two are 25.1 percentage points apart. Cancellations peaked at 5.5% of scheduled stops in Period 4 of 2025-26, against 1.6% over the latest 13 periods.
1 of 3 stations of a similar size in South East are more punctual than Chestfield and Swalecliffe on 78.8%. The comparison group includes Liphook (77.5%), Liss (78.9%) and Hungerford (73.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 17,443 | 78.8% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Chestfield and Swalecliffe? Delay Repay
These operators call at Chestfield and Swalecliffe and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,346 | 69.5% | 1.7% |
| Period 6 of 2026-27 | 1,341 | 74.6% | 1.5% |
| Period 5 of 2026-27 | 1,355 | 75.5% | 1.3% |
| Period 4 of 2026-27 | 1,362 | 82.3% | 1.3% |
| Period 3 of 2026-27 | 1,326 | 71.8% | 3.0% |
| Period 2 of 2026-27 | 1,296 | 72.3% | 1.5% |
| Period 1 of 2026-27 | 1,538 | 86.7% | 1.9% |
| Period 13 of 2025-26 | 1,494 | 86.1% | 2.3% |
| Period 12 of 2025-26 | 1,271 | 87.0% | 1.2% |
| Period 11 of 2025-26 | 1,318 | 83.3% | 1.1% |
| Period 10 of 2025-26 | 1,158 | 81.8% | 0.9% |
| Period 9 of 2025-26 | 1,312 | 74.9% | 1.2% |
| Period 8 of 2025-26 | 1,326 | 77.2% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Liphook | 17,455 | 77.5% | 3.3% |
| Liss | 17,455 | 78.9% | 3.3% |
| Hungerford | 17,417 | 73.3% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out