Hungerford
HGDSouth EastManaged by Great Western Railway
How this station is performing
Hungerford had 17,417 scheduled stops to Period 7 of 2026-27, about 48 a day. 73.3% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Hungerford opened on 21 December 1847. It was moved to the site it uses now on 11 November 1862. Of the 5 stations nearest to it with a known opening date, Hungerford is the oldest; the next oldest, Kintbury, dates from 1847.
The nearest stations to Hungerford are Kintbury (4.8 km east), Bedwyn (7.2 km south-west), Newbury (13.2 km east), Newbury Racecourse (14.3 km east) and Thatcham (18.8 km east). 2 stations lie within 10 km in all. At 73.3%, Hungerford is less punctual than all of them; the best of the five, Kintbury, manages 79.9%.
Hungerford is one of 3 stations named after a market town called Hungerford, home to about 5,866 people; this one stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Hungerford was Period 13 of 2023-24, at 61.0%, some time before the latest year. The strongest was Period 2 of 2025-26, at 83.6%, and the two are 22.6 percentage points apart. Cancellations peaked at 14.3% of scheduled stops in Period 10 of 2023-24, against 3.4% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Hungerford is the least punctual, at 73.3%. All of them are ahead, including Westgate-on-Sea (80.7%), Chestfield and Swalecliffe (78.8%) and Liphook (77.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 17,417 | 73.3% | 3.4% |
Operators with their own page for this station are linked to it.
Late train at Hungerford? Delay Repay
These operators call at Hungerford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,284 | 79.4% | 3.4% |
| Period 6 of 2026-27 | 1,333 | 68.2% | 3.2% |
| Period 5 of 2026-27 | 1,354 | 66.8% | 3.8% |
| Period 4 of 2026-27 | 1,352 | 62.0% | 6.1% |
| Period 3 of 2026-27 | 1,191 | 72.0% | 5.4% |
| Period 2 of 2026-27 | 1,344 | 76.7% | 3.1% |
| Period 1 of 2026-27 | 1,527 | 78.6% | 1.9% |
| Period 13 of 2025-26 | 1,480 | 81.5% | 2.5% |
| Period 12 of 2025-26 | 1,338 | 81.5% | 1.3% |
| Period 11 of 2025-26 | 1,354 | 79.3% | 4.2% |
| Period 10 of 2025-26 | 1,162 | 75.8% | 2.8% |
| Period 9 of 2025-26 | 1,342 | 61.1% | 2.6% |
| Period 8 of 2025-26 | 1,356 | 67.8% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Westgate-on-Sea | 17,400 | 80.7% | 1.8% |
| Chestfield and Swalecliffe | 17,443 | 78.8% | 1.6% |
| Liphook | 17,455 | 77.5% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out