LNER at Lincoln
How this operator is doing here
LNER had 4,203 scheduled stops at Lincoln in the 13 periods to Period 7 of 2026-27, 8% of the station's total. 89.5% of recorded arrivals came within three minutes and 5.9% of stops were cancelled.
LNER trains at Lincoln also serve Newark Northgate (23.6 km south-west, 65.8% on time, 2.9% cancelled), Retford (28.7 km west, 72.6% on time, 3.5% cancelled), Grantham (36.2 km south, 62.1% on time, 3.0% cancelled), Doncaster (51.6 km north-west, 66.0% on time, 2.8% cancelled), Brough (55.7 km north, 69.0% on time, 5.6% cancelled) and Hull (59.0 km north, 79.3% on time, 5.6% cancelled), which are the stations on its network closest to Lincoln.
The busiest LNER station within 30 km of Lincoln is Newark Northgate, 23.6 km south-west, with about 81 scheduled stops a day.
Of the 3 operators with enough records at Lincoln, LNER is the most punctual, at 89.5%.
Lincoln is the most punctual station on the LNER network, out of 35 ranked stations: 89.5% here against 67.6% across the whole network, which is 21.9 percentage points better.
LNER at Lincoln has slipped a little, from 93.1% within three minutes in the previous 13 periods to 89.5% in the latest 13, a fall of 3.6 percentage points. Cancellations rose to 5.9% of scheduled stops from 2.7%, which is 3.2 percentage points more.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 318 | 88.7% | 2.8% |
| Period 6 of 2026-27 | 322 | 85.6% | 7.1% |
| Period 5 of 2026-27 | 345 | 86.6% | 6.7% |
| Period 4 of 2026-27 | 351 | 86.6% | 4.6% |
| Period 3 of 2026-27 | 313 | 89.6% | 1.9% |
| Period 2 of 2026-27 | 350 | 85.3% | 6.9% |
| Period 1 of 2026-27 | 398 | 90.6% | 9.3% |
| Period 13 of 2025-26 | 291 | 92.9% | 7.6% |
| Period 12 of 2025-26 | 286 | 94.5% | 4.2% |
| Period 11 of 2025-26 | 311 | 91.1% | 9.3% |
| Period 10 of 2025-26 | 304 | 91.8% | 8.2% |
| Period 9 of 2025-26 | 294 | 89.6% | 5.4% |
| Period 8 of 2025-26 | 320 | 92.3% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Lincoln
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 34,711 | 88.4% | 1.8% |
| Northern | 11,676 | 85.3% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out