Northern at Lincoln
How this operator is doing here
Northern had 11,676 scheduled stops at Lincoln in the 13 periods to Period 7 of 2026-27, 23% of the station's total. 85.3% of recorded arrivals came within three minutes and 2.6% of stops were cancelled.
Northern trains at Lincoln also serve Saxilby (9.4 km north-west, 76.0% on time, 2.6% cancelled), Gainsborough Lea Road (23.4 km north-west, 79.3% on time, 2.5% cancelled), Gainsborough Central (24.5 km north-west, – on time, – cancelled), Retford (28.7 km west, 80.3% on time, 2.2% cancelled), Kirton Lindsey (29.0 km north, – on time, – cancelled) and Brigg (36.1 km north, – on time, – cancelled), which are the stations on its network closest to Lincoln.
Within 30 km of here, Northern runs best at Retford, 28.7 km west (80.3%), and worst at Saxilby, 9.4 km north-west (76.0%).
The busiest Northern station within 30 km of Lincoln is Retford, 28.7 km west, with about 38 scheduled stops a day.
Northern at Lincoln has slipped sharply. 85.3% of stops came within three minutes of the timetable in the latest 13 periods, 5.8 percentage points worse than the 91.1% recorded in the 13 before. Cancellations fell to 2.6% of scheduled stops from 5.7%, which is 3.1 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 902 | 83.9% | 2.3% |
| Period 6 of 2026-27 | 900 | 86.1% | 2.3% |
| Period 5 of 2026-27 | 900 | 82.6% | 3.1% |
| Period 4 of 2026-27 | 900 | 86.7% | 5.4% |
| Period 3 of 2026-27 | 900 | 83.7% | 2.7% |
| Period 2 of 2026-27 | 900 | 83.7% | 2.6% |
| Period 1 of 2026-27 | 1,032 | 86.3% | 1.6% |
| Period 13 of 2025-26 | 993 | 88.4% | 1.4% |
| Period 12 of 2025-26 | 724 | 83.2% | 1.5% |
| Period 11 of 2025-26 | 900 | 85.8% | 2.0% |
| Period 10 of 2025-26 | 825 | 83.0% | 4.2% |
| Period 9 of 2025-26 | 900 | 86.0% | 2.7% |
| Period 8 of 2025-26 | 900 | 87.8% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Lincoln
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 34,711 | 88.4% | 1.8% |
| LNER | 4,203 | 89.5% | 5.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out