Southeastern had 167,784 scheduled stops at Lewisham in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 87.0% of recorded arrivals came within three minutes and 1.5% of stops were cancelled.
Southeastern trains at Lewisham also serve St Johns (London) (0.7 km north-west, 91.9% on time, 1.5% cancelled), Ladywell (1.1 km south, 93.0% on time, 1.1% cancelled), Greenwich (1.4 km north, 89.5% on time, 1.8% cancelled), Blackheath (1.5 km east, 87.6% on time, 1.8% cancelled), Deptford (1.7 km north-west, 88.0% on time, 1.9% cancelled) and New Cross (1.8 km north-west, 90.1% on time, 1.5% cancelled), which are the stations on its network closest to Lewisham.
Within 30 km of here, Southeastern runs best at Sundridge Park, 6.3 km south-east (99.4%), and worst at Sevenoaks, 25.1 km south-east (72.3%).
The busiest Southeastern station within 30 km of Lewisham is London Bridge, 6.6 km north-west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Lewisham, Southeastern is the least punctual, at 87.0%.
Southeastern at Lewisham has edged up: 87.0% of stops came within three minutes of the timetable in the latest 13 periods, 2.4 percentage points better than the 84.6% of the 13 before. Cancellations held steady at 1.5% of scheduled stops, against 1.6% before.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 11,919 | 85.7% | 1.0% |
| Period 6 of 2026-27 | 12,800 | 85.2% | 0.8% |
| Period 5 of 2026-27 | 13,509 | 88.1% | 2.2% |
| Period 4 of 2026-27 | 12,947 | 88.1% | 1.4% |
| Period 3 of 2026-27 | 13,038 | 84.7% | 2.7% |
| Period 2 of 2026-27 | 12,415 | 85.6% | 3.3% |
| Period 1 of 2026-27 | 14,981 | 89.3% | 0.9% |
| Period 13 of 2025-26 | 13,228 | 89.0% | 2.0% |
| Period 12 of 2025-26 | 13,567 | 87.3% | 1.3% |
| Period 11 of 2025-26 | 12,246 | 88.2% | 0.9% |
| Period 10 of 2025-26 | 10,764 | 88.5% | 1.3% |
| Period 9 of 2025-26 | 13,258 | 85.6% | 0.9% |
| Period 8 of 2025-26 | 13,112 | 85.3% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Lewisham
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 387 | 90.9% | 1.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out