GTR at Lewisham
How this operator is doing here
GTR had 387 scheduled stops at Lewisham in the 13 periods to Period 7 of 2026-27, 0% of the station's total. 90.9% of recorded arrivals came within three minutes and 1.0% of stops were cancelled.
GTR trains at Lewisham also serve Greenwich (1.4 km north, 81.9% on time, 6.7% cancelled), Blackheath (1.5 km east, 91.6% on time, 1.3% cancelled), Brockley (1.6 km west, 94.1% on time, 3.7% cancelled), Deptford (1.7 km north-west, 84.1% on time, 6.8% cancelled), Crofton Park (2.0 km south-west, 92.0% on time, 4.1% cancelled) and New Cross Gate (2.1 km north-west, 92.9% on time, 3.7% cancelled), which are the stations on its network closest to Lewisham.
Within 30 km of here, GTR runs best at Beckenham Junction, 6.1 km south (98.1%), and worst at Kenley, 16.8 km south (66.9%).
The busiest GTR station within 30 km of Lewisham is East Croydon, 11.4 km south-west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Lewisham, GTR is the most punctual, at 90.9%.
GTR cancels fewer trains at Lewisham than elsewhere: 1.0% of scheduled stops, against 4.7% across its network and 1.5% for every operator at the station.
Alongside GTR, the other operators at Lewisham are Southeastern (87.0%, 100% of stops), so passengers here can compare several services.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 0 | – | – |
| Period 6 of 2026-27 | 0 | – | – |
| Period 5 of 2026-27 | 62 | 83.9% | 0.0% |
| Period 4 of 2026-27 | 0 | – | – |
| Period 3 of 2026-27 | 202 | 88.9% | 2.0% |
| Period 2 of 2026-27 | 0 | – | – |
| Period 1 of 2026-27 | 0 | – | – |
| Period 13 of 2025-26 | 0 | – | – |
| Period 12 of 2025-26 | 0 | – | – |
| Period 11 of 2025-26 | 61 | 96.7% | 0.0% |
| Period 10 of 2025-26 | 0 | – | – |
| Period 9 of 2025-26 | 62 | 98.4% | 0.0% |
| Period 8 of 2025-26 | 0 | – | – |
Other operators at Lewisham
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 167,784 | 87.0% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out