Lairg
LRGScotlandManaged by ScotRail
How this station is performing
Lairg had 2,734 scheduled stops to Period 7 of 2026-27, about 8 a day. 76.4% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Lairg opened on 13 April 1868, 158 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Ardgay is the oldest (1864) and Culrain the newest (1870), with Lairg in between.
The nearest stations to Lairg are Invershin (8.6 km south), Culrain (9.2 km south), Ardgay (13.6 km south), Rogart (14.3 km east) and Golspie (24.6 km east). 2 stations lie within 10 km in all.
Lairg takes its name from a settlement called Lairg, home to about 891 people, and the station stands 2.0 km from its centre.
Lairg improved sharply over the past year. In the latest 13 periods 76.4% of stops came within three minutes of the timetable, up 18.0 percentage points from 58.4% in the 13 before. Cancellations rose to 3.4% of scheduled stops from 2.2%, which is 1.2 percentage points more.
Compared with 3 stations of a similar size in Scotland, Lairg is the least punctual, at 76.4%. All of them are ahead, including Arisaig (88.8%), Banavie (83.3%) and Corpach (85.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 2,734 | 76.4% | 3.4% |
Operators with their own page for this station are linked to it.
Late train at Lairg? Delay Repay
These operators call at Lairg and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 224 | 73.8% | 1.3% |
| Period 6 of 2026-27 | 224 | 76.6% | 2.7% |
| Period 5 of 2026-27 | 222 | 82.7% | 6.3% |
| Period 4 of 2026-27 | 220 | 75.5% | 3.6% |
| Period 3 of 2026-27 | 57 | 80.7% | 0.0% |
| Period 2 of 2026-27 | 224 | 79.3% | 0.9% |
| Period 1 of 2026-27 | 258 | 88.2% | 1.2% |
| Period 13 of 2025-26 | 243 | 79.7% | 2.5% |
| Period 12 of 2025-26 | 224 | 87.0% | 3.6% |
| Period 11 of 2025-26 | 204 | 67.7% | 8.8% |
| Period 10 of 2025-26 | 190 | 78.5% | 4.7% |
| Period 9 of 2025-26 | 221 | 71.4% | 5.0% |
| Period 8 of 2025-26 | 223 | 51.8% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out