Kiveton Park
KVPYorkshire and The HumberManaged by Northern Trains
How this station is performing
Kiveton Park had 13,975 scheduled stops to Period 7 of 2026-27, about 38 a day. 82.7% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.
Kiveton Park opened on 17 July 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Kiveton Park is the oldest; the next oldest, Shireoaks, dates from 1849.
The nearest stations to Kiveton Park are Kiveton Bridge (1.8 km west), Shireoaks (5.0 km east), Whitwell (Derbyshire) (6.9 km south-east), Creswell (8.3 km south) and Worksop (8.3 km east). 6 stations lie within 10 km in all. Of the five, Kiveton Bridge is the most punctual at 83.9% and Shireoaks the least at 82.5%, with Kiveton Park on 82.7%.
Kiveton Park takes its name from a Village called Kiveton Park, and the station stands 1.4 km from its centre.
Across the whole run of data, the weakest four-week period for Kiveton Park was Period 9 of 2023-24, at 71.2%, some time before the latest year. The strongest was Period 2 of 2024-25, at 91.8%, and the two are 20.6 percentage points apart. Cancellations peaked at 19.0% of scheduled stops in Period 8 of 2023-24, against 2.0% over the latest 13 periods.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Kiveton Park is the most punctual, at 82.7%. The comparison group includes Ferriby (77.6%), Hessle (80.6%) and Bolton-upon-Dearne (71.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 13,975 | 82.7% | 2.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,080 | 82.5% | 1.7% |
| Period 6 of 2026-27 | 1,080 | 83.4% | 1.0% |
| Period 5 of 2026-27 | 1,080 | 80.6% | 1.9% |
| Period 4 of 2026-27 | 1,080 | 84.9% | 4.4% |
| Period 3 of 2026-27 | 1,080 | 81.7% | 2.6% |
| Period 2 of 2026-27 | 1,078 | 83.1% | 2.2% |
| Period 1 of 2026-27 | 1,236 | 85.3% | 1.7% |
| Period 13 of 2025-26 | 1,185 | 85.8% | 0.9% |
| Period 12 of 2025-26 | 869 | 80.2% | 1.0% |
| Period 11 of 2025-26 | 1,076 | 83.6% | 1.7% |
| Period 10 of 2025-26 | 979 | 82.5% | 3.4% |
| Period 9 of 2025-26 | 1,076 | 78.3% | 2.0% |
| Period 8 of 2025-26 | 1,076 | 82.6% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ferriby | 13,984 | 77.6% | 3.4% |
| Hessle | 13,984 | 80.6% | 3.3% |
| Bolton-upon-Dearne | 14,109 | 71.8% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out