How this station is performing
Hessle had 13,984 scheduled stops to Period 7 of 2026-27, about 38 a day. 80.6% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Hessle opened on 2 July 1840, 186 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Hessle is the oldest; the next oldest, Ferriby, dates from 1840.
The nearest stations to Hessle are Barton-on-Humber (3.2 km south), Barrow Haven (3.9 km south-east), Ferriby (4.3 km west), New Holland (5.7 km east) and Hull (6.9 km north-east). 8 stations lie within 10 km in all. At 80.6%, Hessle is more punctual than every one of them; the best of the five, Hull, manages 78.3%.
Hessle is one of 2 stations named after a town called Hessle, home to about 15,486 people; this one stands 1.0 km from its centre.
For Hessle, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 70.9% of stops arrived within three minutes of the timetable. The strongest was Period 13 of 2023-24, at 90.8%, which is 19.9 percentage points higher. Cancellations peaked at 9.0% of scheduled stops in Period 7 of 2023-24, against 3.3% over the latest 13 periods.
1 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Hessle on 80.6%. The comparison group includes Ferriby (77.6%), Kiveton Park (82.7%) and Bolton-upon-Dearne (71.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 13,984 | 80.6% | 3.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,060 | 78.6% | 2.9% |
| Period 6 of 2026-27 | 1,075 | 82.5% | 2.7% |
| Period 5 of 2026-27 | 1,073 | 81.3% | 3.3% |
| Period 4 of 2026-27 | 1,073 | 79.9% | 8.5% |
| Period 3 of 2026-27 | 1,073 | 85.4% | 2.9% |
| Period 2 of 2026-27 | 1,072 | 78.2% | 3.2% |
| Period 1 of 2026-27 | 1,231 | 88.8% | 2.2% |
| Period 13 of 2025-26 | 1,188 | 85.3% | 1.9% |
| Period 12 of 2025-26 | 1,073 | 81.2% | 1.8% |
| Period 11 of 2025-26 | 1,040 | 78.2% | 4.7% |
| Period 10 of 2025-26 | 968 | 80.3% | 3.5% |
| Period 9 of 2025-26 | 1,029 | 70.9% | 4.2% |
| Period 8 of 2025-26 | 1,029 | 76.3% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ferriby | 13,984 | 77.6% | 3.4% |
| Kiveton Park | 13,975 | 82.7% | 2.0% |
| Bolton-upon-Dearne | 14,109 | 71.8% | 2.2% |