Ferriby
FRYYorkshire and The HumberManaged by Northern Trains
How this station is performing
Ferriby had 13,984 scheduled stops to Period 7 of 2026-27, about 38 a day. 77.6% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Ferriby opened on 2 July 1840, 186 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Ferriby is the oldest; the next oldest, Hessle, dates from 1840.
The nearest stations to Ferriby are Hessle (4.3 km east), Brough (4.8 km west), Barton-on-Humber (5.3 km south-east), Barrow Haven (7.9 km east) and Cottingham (9.8 km north-east). 6 stations lie within 10 km in all. Of the five, Hessle is the most punctual at 80.6% and Brough the least at 72.6%, with Ferriby on 77.6%.
Ferriby is named after North Ferriby, a Village, home to about 3,963 people, but the station stands 0.3 km from its centre.
For Ferriby, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 67.1% of stops arrived within three minutes of the timetable. The strongest was Period 13 of 2023-24, at 89.6%, which is 22.5 percentage points higher. Cancellations peaked at 9.0% of scheduled stops in Period 7 of 2023-24, against 3.4% over the latest 13 periods.
2 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Ferriby on 77.6%. The comparison group includes Hessle (80.6%), Kiveton Park (82.7%) and Bolton-upon-Dearne (71.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 13,984 | 77.6% | 3.4% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,060 | 74.1% | 2.9% |
| Period 6 of 2026-27 | 1,075 | 80.4% | 2.7% |
| Period 5 of 2026-27 | 1,073 | 79.5% | 3.3% |
| Period 4 of 2026-27 | 1,073 | 75.7% | 8.5% |
| Period 3 of 2026-27 | 1,073 | 82.4% | 2.9% |
| Period 2 of 2026-27 | 1,072 | 76.3% | 3.2% |
| Period 1 of 2026-27 | 1,231 | 82.3% | 2.2% |
| Period 13 of 2025-26 | 1,188 | 83.6% | 1.9% |
| Period 12 of 2025-26 | 1,073 | 77.9% | 1.9% |
| Period 11 of 2025-26 | 1,040 | 75.8% | 4.9% |
| Period 10 of 2025-26 | 968 | 76.6% | 3.6% |
| Period 9 of 2025-26 | 1,029 | 67.1% | 4.2% |
| Period 8 of 2025-26 | 1,029 | 74.1% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hessle | 13,984 | 80.6% | 3.3% |
| Kiveton Park | 13,975 | 82.7% | 2.0% |
| Bolton-upon-Dearne | 14,109 | 71.8% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out