Kilwinning
KWNScotlandManaged by ScotRail
How this station is performing
Kilwinning had 52,252 scheduled stops to Period 7 of 2026-27, about 144 a day. 88.8% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Kilwinning opened on 23 March 1840, 186 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Irvine is the oldest (1839) and Ardrossan South Beach the newest (1883), with Kilwinning in between.
The nearest stations to Kilwinning are Stevenston (3.5 km south-west), Saltcoats (5.3 km south-west), Irvine (5.5 km south-east), Dalry (5.6 km north) and Ardrossan South Beach (5.9 km west). 9 stations lie within 10 km in all. Of the five, Irvine is the most punctual at 93.0% and Ardrossan South Beach the least at 86.1%, with Kilwinning on 88.8%.
Kilwinning takes its name from a town called Kilwinning, home to about 16,460 people, and the station stands 0.9 km from its centre.
For Kilwinning, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 81.4% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 94.4%, which is 13.0 percentage points higher. Cancellations peaked at 5.3% of scheduled stops in Period 9 of 2025-26, against 1.6% over the latest 13 periods.
1 of 3 stations of a similar size in Scotland are more punctual than Kilwinning on 88.8%. The comparison group includes Airdrie (86.1%), Johnstone (Renfrewshire) (92.6%) and Coatbridge Sunnyside (87.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 52,252 | 88.8% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Kilwinning? Delay Repay
These operators call at Kilwinning and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,075 | 87.0% | 0.6% |
| Period 6 of 2026-27 | 4,103 | 90.1% | 0.7% |
| Period 5 of 2026-27 | 4,076 | 90.3% | 0.6% |
| Period 4 of 2026-27 | 4,076 | 89.5% | 1.1% |
| Period 3 of 2026-27 | 4,078 | 92.6% | 1.0% |
| Period 2 of 2026-27 | 4,075 | 89.6% | 1.2% |
| Period 1 of 2026-27 | 4,691 | 92.8% | 2.6% |
| Period 13 of 2025-26 | 3,369 | 91.4% | 1.5% |
| Period 12 of 2025-26 | 4,072 | 91.2% | 1.1% |
| Period 11 of 2025-26 | 4,072 | 88.8% | 0.7% |
| Period 10 of 2025-26 | 3,603 | 82.8% | 1.3% |
| Period 9 of 2025-26 | 3,929 | 81.4% | 5.3% |
| Period 8 of 2025-26 | 4,033 | 85.6% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Airdrie | 51,774 | 86.1% | 1.5% |
| Johnstone (Renfrewshire) | 51,491 | 92.6% | 1.6% |
| Coatbridge Sunnyside | 51,460 | 87.5% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out