Johnstone (Renfrewshire)
JHNScotlandManaged by ScotRail
How this station is performing
Johnstone (Renfrewshire) had 51,491 scheduled stops to Period 7 of 2026-27, about 142 a day. 92.6% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Johnstone (Renfrewshire) opened on 21 July 1840, 186 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Johnstone (Renfrewshire) is the oldest; the next oldest, Paisley Gilmour Street, dates from 1840.
The nearest stations to Johnstone (Renfrewshire) are Milliken Park (2.2 km south-west), Paisley St James (4.3 km north-east), Howwood (Renfrewshire) (4.6 km south-west), Paisley Canal (5.1 km east) and Paisley Gilmour Street (5.1 km east). 18 stations lie within 10 km in all. Of the five, Paisley St James is the most punctual at 95.2% and Howwood (Renfrewshire) the least at 89.9%, with Johnstone (Renfrewshire) on 92.6%.
Johnstone (Renfrewshire) is named after Johnstone, a town, home to about 16,090 people, but the station stands 0.2 km from its centre.
For Johnstone (Renfrewshire), the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 86.8% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2026-27, at 95.9%, which is 9.1 percentage points higher. Cancellations peaked at 5.6% of scheduled stops in Period 9 of 2025-26, against 1.6% over the latest 13 periods.
Compared with 3 stations of a similar size in Scotland, Johnstone (Renfrewshire) is the most punctual, at 92.6%. The comparison group includes Coatbridge Sunnyside (87.5%), Airdrie (86.1%) and Kilwinning (88.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 51,491 | 92.6% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Johnstone (Renfrewshire)? Delay Repay
These operators call at Johnstone (Renfrewshire) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,055 | 91.7% | 0.6% |
| Period 6 of 2026-27 | 4,033 | 94.4% | 0.6% |
| Period 5 of 2026-27 | 4,056 | 93.6% | 0.5% |
| Period 4 of 2026-27 | 4,056 | 92.9% | 1.2% |
| Period 3 of 2026-27 | 4,058 | 95.2% | 1.1% |
| Period 2 of 2026-27 | 4,065 | 93.3% | 1.3% |
| Period 1 of 2026-27 | 4,691 | 95.9% | 3.0% |
| Period 13 of 2025-26 | 2,778 | 93.5% | 1.6% |
| Period 12 of 2025-26 | 4,072 | 94.1% | 1.0% |
| Period 11 of 2025-26 | 4,072 | 92.1% | 0.6% |
| Period 10 of 2025-26 | 3,603 | 89.4% | 1.5% |
| Period 9 of 2025-26 | 3,919 | 86.8% | 5.6% |
| Period 8 of 2025-26 | 4,033 | 90.4% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Coatbridge Sunnyside | 51,460 | 87.5% | 1.9% |
| Airdrie | 51,774 | 86.1% | 1.5% |
| Kilwinning | 52,252 | 88.8% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out