Bearsted
BSDSouth EastManaged by Southeastern
How this station is performing
Bearsted had 21,190 scheduled stops to Period 7 of 2026-27, about 58 a day. 81.7% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Bearsted opened on 1 July 1884, 142 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Bearsted is the newest; the oldest, Maidstone West, opened in 1844.
The nearest stations to Bearsted are Hollingbourne (3.6 km east), Maidstone East (4.0 km west), Maidstone West (4.4 km west), Maidstone Barracks (4.4 km west) and East Farleigh (6.9 km west). 10 stations lie within 10 km in all. At 81.7%, Bearsted is less punctual than all of them; the best of the five, Maidstone Barracks, manages 95.2%.
Bearsted takes its name from a Village called Bearsted, home to about 8,354 people, and the station stands 0.3 km from its centre.
For Bearsted, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 68.6% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 92.8%, which is 24.2 percentage points higher.
2 of 3 stations of a similar size in South East are more punctual than Bearsted on 81.7%. The comparison group includes Denham (89.7%), Kempton Park Racecourse (85.8%) and Pluckley (72.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 21,190 | 81.7% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Bearsted? Delay Repay
These operators call at Bearsted and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,690 | 69.2% | 1.3% |
| Period 6 of 2026-27 | 1,668 | 68.6% | 1.6% |
| Period 5 of 2026-27 | 1,733 | 80.6% | 1.5% |
| Period 4 of 2026-27 | 1,711 | 86.7% | 1.6% |
| Period 3 of 2026-27 | 1,666 | 84.4% | 2.7% |
| Period 2 of 2026-27 | 1,198 | 87.2% | 1.1% |
| Period 1 of 2026-27 | 1,862 | 90.6% | 0.4% |
| Period 13 of 2025-26 | 1,839 | 89.7% | 1.1% |
| Period 12 of 2025-26 | 1,663 | 85.6% | 1.0% |
| Period 11 of 2025-26 | 1,656 | 84.6% | 1.1% |
| Period 10 of 2025-26 | 1,290 | 82.6% | 0.9% |
| Period 9 of 2025-26 | 1,614 | 75.3% | 1.1% |
| Period 8 of 2025-26 | 1,600 | 77.0% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Denham | 21,336 | 89.7% | 1.6% |
| Kempton Park Racecourse | 21,017 | 85.8% | 4.8% |
| Pluckley | 20,899 | 72.8% | 1.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out