Pluckley had 20,899 scheduled stops to Period 7 of 2026-27, about 57 a day. 72.8% of recorded arrivals were within three minutes of the timetable and 1.1% of scheduled stops were cancelled.
Pluckley opened on 1 December 1842, 184 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Pluckley is the oldest; the next oldest, Headcorn, dates from 1842.
The nearest stations to Pluckley are Charing (Kent) (6.5 km north-east), Headcorn (8.4 km west), Ashford International (9.1 km east), Lenham (9.1 km north) and Harrietsham (11.1 km north-west). 4 stations lie within 10 km in all. At 72.8%, Pluckley is less punctual than all of them; the best of the five, Harrietsham, manages 81.0%.
Pluckley takes its name from a Village called Pluckley, home to about 1,080 people, and the station stands 2.3 km from its centre.
Across the whole run of data, the weakest four-week period for Pluckley was Period 9 of 2024-25, at 53.7%, some time before the latest year. The strongest was Period 2 of 2023-24, at 84.9%, and the two are 31.2 percentage points apart.
Compared with 3 stations of a similar size in South East, Pluckley is the least punctual, at 72.8%. All of them are ahead, including Kempton Park Racecourse (85.8%), Great Missenden (86.5%) and Stoke Mandeville (87.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 20,899 | 72.8% | 1.1% |
Operators with their own page for this station are linked to it.
Late train at Pluckley? Delay Repay
These operators call at Pluckley and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,647 | 56.7% | 1.7% |
| Period 6 of 2026-27 | 1,573 | 58.1% | 1.1% |
| Period 5 of 2026-27 | 1,650 | 72.3% | 1.2% |
| Period 4 of 2026-27 | 1,579 | 76.8% | 0.9% |
| Period 3 of 2026-27 | 1,616 | 75.1% | 1.1% |
| Period 2 of 2026-27 | 1,551 | 78.8% | 1.0% |
| Period 1 of 2026-27 | 1,859 | 82.7% | 0.6% |
| Period 13 of 2025-26 | 1,748 | 79.8% | 0.9% |
| Period 12 of 2025-26 | 1,583 | 77.7% | 0.7% |
| Period 11 of 2025-26 | 1,575 | 75.8% | 0.8% |
| Period 10 of 2025-26 | 1,273 | 77.4% | 1.5% |
| Period 9 of 2025-26 | 1,637 | 66.1% | 1.8% |
| Period 8 of 2025-26 | 1,608 | 68.2% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kempton Park Racecourse | 21,017 | 85.8% | 4.8% |
| Great Missenden | 20,733 | 86.5% | 1.4% |
| Stoke Mandeville | 20,733 | 87.2% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out