Chiltern Railways at Jewellery Quarter
All trains at Jewellery QuarterChiltern Railways across BritainWest Midlands
On time, last 13 periods–Whole station: 87.1%
Cancelled–Whole station: 3.5%
Scheduled stops257Of 41,478 at the station
How this operator is doing here
There are not enough usable records of Chiltern Railways at Jewellery Quarter to report how punctual it is.
Period by period
See how Chiltern Railways Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 20 | – | – |
| Period 6 of 2026-27 | 20 | – | – |
| Period 5 of 2026-27 | 17 | – | – |
| Period 4 of 2026-27 | 20 | – | – |
| Period 3 of 2026-27 | 19 | – | – |
| Period 2 of 2026-27 | 20 | – | – |
| Period 1 of 2026-27 | 23 | – | – |
| Period 13 of 2025-26 | 22 | – | – |
| Period 12 of 2025-26 | 20 | – | – |
| Period 11 of 2025-26 | 20 | – | – |
| Period 10 of 2025-26 | 17 | – | – |
| Period 9 of 2025-26 | 19 | – | – |
| Period 8 of 2025-26 | 20 | – | – |
Other operators at Jewellery Quarter
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 41,221 | 87.2% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out