Jewellery Quarter
JEQWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Jewellery Quarter had 41,478 scheduled stops to Period 7 of 2026-27, about 114 a day. 87.1% of recorded arrivals were within three minutes of the timetable and 3.5% of scheduled stops were cancelled.
Jewellery Quarter opened on 25 September 1995, 31 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Jewellery Quarter is the newest; the oldest, Birmingham Snow Hill, opened in 1852.
The nearest stations to Jewellery Quarter are Birmingham Snow Hill (1.1 km south-east), Birmingham New Street (1.7 km south-east), Birmingham Moor Street (1.8 km south-east), Five Ways (2.0 km south) and Duddeston (2.9 km east). 39 stations lie within 10 km in all. Of the five, Birmingham Moor Street is the most punctual at 87.8% and Birmingham New Street the least at 67.9%, with Jewellery Quarter on 87.1%.
Jewellery Quarter takes its name from a neighborhood called Jewellery Quarter, home to about 19,000 people, and the station stands 0.3 km from its centre.
Compared with 3 stations of a similar size in West Midlands, Jewellery Quarter is the least punctual, at 87.1%. All of them are ahead, including The Hawthorns (87.5%), Cradley Heath (88.2%) and Rowley Regis (88.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 41,221 | 87.2% | 3.5% |
| Chiltern Railways | 257 | – | – |
Operators with their own page for this station are linked to it.
Late train at Jewellery Quarter? Delay Repay
These operators call at Jewellery Quarter and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,276 | 86.0% | 2.1% |
| Period 6 of 2026-27 | 3,276 | 86.6% | 1.9% |
| Period 5 of 2026-27 | 2,416 | 86.3% | 7.9% |
| Period 4 of 2026-27 | 3,020 | 81.7% | 4.7% |
| Period 3 of 2026-27 | 3,161 | 84.6% | 2.8% |
| Period 2 of 2026-27 | 3,022 | 84.5% | 3.9% |
| Period 1 of 2026-27 | 3,791 | 89.7% | 3.0% |
| Period 13 of 2025-26 | 3,580 | 90.3% | 3.1% |
| Period 12 of 2025-26 | 3,276 | 92.1% | 2.0% |
| Period 11 of 2025-26 | 3,191 | 92.0% | 3.4% |
| Period 10 of 2025-26 | 2,921 | 88.2% | 3.7% |
| Period 9 of 2025-26 | 3,274 | 83.3% | 4.0% |
| Period 8 of 2025-26 | 3,274 | 85.8% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| The Hawthorns | 41,477 | 87.5% | 3.5% |
| Cradley Heath | 41,511 | 88.2% | 3.5% |
| Rowley Regis | 42,556 | 88.1% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out