Irvine
IRVScotlandManaged by ScotRail
How this station is performing
Irvine had 26,754 scheduled stops to Period 7 of 2026-27, about 74 a day. 93.0% of recorded arrivals were within three minutes of the timetable and 1.4% of scheduled stops were cancelled.
Irvine opened on 5 August 1839, 187 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Irvine is the oldest; the next oldest, Barassie, dates from 1839.
The nearest stations to Irvine are Stevenston (5.4 km north-west), Kilwinning (5.5 km north-west), Barassie (5.7 km south), Saltcoats (7.3 km west) and Troon (7.7 km south). 9 stations lie within 10 km in all. At 93.0%, Irvine is more punctual than every one of them; the best of the five, Troon, manages 92.9%.
Irvine takes its name from a town of the United Kingdom called Irvine, home to about 33,698 people, and the station stands 1.3 km from its centre.
Across the whole run of data, the weakest four-week period for Irvine was Period 10 of 2023-24, at 85.4%, some time before the latest year. The strongest was Period 13 of 2023-24, at 96.6%, and the two are 11.2 percentage points apart. Cancellations peaked at 5.0% of scheduled stops in Period 12 of 2024-25, against 1.4% over the latest 13 periods.
1 of 3 stations of a similar size in Scotland are more punctual than Irvine on 93.0%. The comparison group includes Glengarnock (90.4%), Hillington East (96.0%) and South Gyle (82.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 26,754 | 93.0% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at Irvine? Delay Repay
These operators call at Irvine and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,084 | 93.0% | 0.1% |
| Period 6 of 2026-27 | 2,074 | 95.0% | 0.9% |
| Period 5 of 2026-27 | 2,084 | 94.1% | 1.1% |
| Period 4 of 2026-27 | 2,084 | 91.5% | 0.9% |
| Period 3 of 2026-27 | 2,086 | 94.0% | 1.3% |
| Period 2 of 2026-27 | 2,083 | 94.9% | 0.9% |
| Period 1 of 2026-27 | 2,379 | 95.0% | 1.4% |
| Period 13 of 2025-26 | 1,743 | 92.6% | 1.5% |
| Period 12 of 2025-26 | 2,080 | 95.1% | 0.8% |
| Period 11 of 2025-26 | 2,080 | 93.9% | 0.6% |
| Period 10 of 2025-26 | 1,872 | 88.5% | 0.9% |
| Period 9 of 2025-26 | 2,025 | 86.7% | 4.6% |
| Period 8 of 2025-26 | 2,080 | 93.5% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Glengarnock | 26,484 | 90.4% | 1.8% |
| Hillington East | 27,029 | 96.0% | 1.3% |
| South Gyle | 27,074 | 82.3% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out