Hillington East
HLEScotlandManaged by ScotRail
How this station is performing
Hillington East had 27,029 scheduled stops to Period 7 of 2026-27, about 74 a day. 96.0% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Hillington East opened on 19 March 1934, 92 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Cardonald is the oldest (1843) and Corkerhill the newest (1990), with Hillington East in between.
The nearest stations to Hillington East are Cardonald (0.9 km east), Hillington West (1.0 km west), Crookston (1.5 km south-west), Mosspark (1.6 km south) and Corkerhill (2.3 km south-east). 76 stations lie within 10 km in all. Of the five, Hillington West is the most punctual at 96.3% and Crookston the least at 92.6%, with Hillington East on 96.0%.
Hillington East is among the most punctual stations in Britain. Its 96.0% puts it 78th out of 2,374 ranked stations, with 77 ahead of it and 2,296 behind, and 12.1 percentage points above the national median of 83.9%.
Compared with 3 stations of a similar size in Scotland, Hillington East is the most punctual, at 96.0%. The comparison group includes South Gyle (82.3%), Irvine (93.0%) and Glengarnock (90.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 27,029 | 96.0% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Hillington East? Delay Repay
These operators call at Hillington East and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,061 | 96.0% | 1.2% |
| Period 6 of 2026-27 | 2,120 | 97.6% | 0.4% |
| Period 5 of 2026-27 | 2,117 | 96.9% | 2.0% |
| Period 4 of 2026-27 | 2,120 | 96.9% | 0.8% |
| Period 3 of 2026-27 | 2,120 | 97.1% | 1.0% |
| Period 2 of 2026-27 | 2,120 | 95.7% | 0.6% |
| Period 1 of 2026-27 | 2,433 | 96.6% | 3.5% |
| Period 13 of 2025-26 | 1,607 | 96.5% | 1.9% |
| Period 12 of 2025-26 | 2,118 | 96.1% | 0.9% |
| Period 11 of 2025-26 | 2,120 | 96.5% | 0.5% |
| Period 10 of 2025-26 | 1,854 | 93.5% | 1.1% |
| Period 9 of 2025-26 | 2,119 | 93.5% | 2.5% |
| Period 8 of 2025-26 | 2,120 | 94.3% | 0.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Gyle | 27,074 | 82.3% | 1.4% |
| Irvine | 26,754 | 93.0% | 1.4% |
| Glengarnock | 26,484 | 90.4% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out