Hove
HOVSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Hove had 71,508 scheduled stops to Period 7 of 2026-27, about 196 a day. 79.6% of recorded arrivals were within three minutes of the timetable and 3.7% of scheduled stops were cancelled.
Hove opened on 1 October 1865, 161 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Brighton is the oldest (1840) and Aldrington the newest (1905), with Hove in between.
The nearest stations to Hove are Aldrington (0.9 km west), Preston Park (1.6 km north-east), Brighton (2.2 km east), London Road (Brighton) (2.4 km east) and Portslade (2.4 km west). 10 stations lie within 10 km in all. Of the five, London Road (Brighton) is the most punctual at 91.4% and Preston Park the least at 76.3%, with Hove on 79.6%.
Hove takes its name from a town called Hove, home to about 9,319 people, and the station stands 0.5 km from its centre.
Across the whole run of data, the weakest four-week period for Hove was Period 9 of 2024-25, at 72.7%, some time before the latest year. The strongest was Period 1 of 2023-24, at 89.4%, and the two are 16.7 percentage points apart.
1 of 3 stations of a similar size in South East are more punctual than Hove on 79.6%. The comparison group includes Aldershot (90.7%), Worthing (77.6%) and Chichester (76.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 71,508 | 79.6% | 3.7% |
Operators with their own page for this station are linked to it.
Late train at Hove? Delay Repay
These operators call at Hove and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,428 | 73.8% | 4.1% |
| Period 6 of 2026-27 | 5,494 | 73.4% | 3.9% |
| Period 5 of 2026-27 | 5,499 | 75.8% | 3.5% |
| Period 4 of 2026-27 | 5,527 | 80.6% | 2.6% |
| Period 3 of 2026-27 | 5,398 | 77.9% | 3.8% |
| Period 2 of 2026-27 | 5,480 | 80.4% | 6.7% |
| Period 1 of 2026-27 | 6,220 | 84.1% | 3.8% |
| Period 13 of 2025-26 | 5,853 | 85.6% | 4.0% |
| Period 12 of 2025-26 | 5,550 | 84.1% | 2.5% |
| Period 11 of 2025-26 | 5,447 | 84.3% | 3.5% |
| Period 10 of 2025-26 | 4,946 | 81.9% | 2.3% |
| Period 9 of 2025-26 | 5,365 | 73.6% | 4.1% |
| Period 8 of 2025-26 | 5,301 | 78.6% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Aldershot | 70,543 | 90.7% | 2.1% |
| Worthing | 70,306 | 77.6% | 3.2% |
| Chichester | 70,144 | 76.9% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out