Burgess Hill
BUGSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Burgess Hill had 76,996 scheduled stops to Period 7 of 2026-27, about 212 a day. 76.5% of recorded arrivals were within three minutes of the timetable and 6.6% of scheduled stops were cancelled.
Burgess Hill opened on 21 September 1841, 185 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Burgess Hill is the oldest; the next oldest, Hassocks, dates from 1841.
The nearest stations to Burgess Hill are Wivelsfield (1.3 km north), Hassocks (3.4 km south), Plumpton (5.5 km south-east), Haywards Heath (5.9 km north) and Cooksbridge (10.0 km south-east). 5 stations lie within 10 km in all. At 76.5%, Burgess Hill is more punctual than every one of them; the best of the five, Hassocks, manages 74.8%.
Burgess Hill takes its name from a town called Burgess Hill, home to about 32,491 people, and the station stands 0.1 km from its centre.
For Burgess Hill, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 60.0% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2026-27, at 85.5%, which is 25.5 percentage points higher.
1 of 3 stations of a similar size in South East are more punctual than Burgess Hill on 76.5%. The comparison group includes Horsham (72.6%), Epsom (Surrey) (86.7%) and Portsmouth Harbour (73.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 76,996 | 76.5% | 6.6% |
Operators with their own page for this station are linked to it.
Late train at Burgess Hill? Delay Repay
These operators call at Burgess Hill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,683 | 70.6% | 5.0% |
| Period 6 of 2026-27 | 6,045 | 60.0% | 9.0% |
| Period 5 of 2026-27 | 5,882 | 70.7% | 7.7% |
| Period 4 of 2026-27 | 5,919 | 76.0% | 9.1% |
| Period 3 of 2026-27 | 5,728 | 77.1% | 7.1% |
| Period 2 of 2026-27 | 5,790 | 81.1% | 7.5% |
| Period 1 of 2026-27 | 6,955 | 85.5% | 5.0% |
| Period 13 of 2025-26 | 6,292 | 85.4% | 3.9% |
| Period 12 of 2025-26 | 5,832 | 79.8% | 6.0% |
| Period 11 of 2025-26 | 5,432 | 79.9% | 3.5% |
| Period 10 of 2025-26 | 5,461 | 80.0% | 4.9% |
| Period 9 of 2025-26 | 5,896 | 68.7% | 9.3% |
| Period 8 of 2025-26 | 6,081 | 77.2% | 8.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Horsham | 77,338 | 72.6% | 3.8% |
| Epsom (Surrey) | 77,622 | 86.7% | 2.8% |
| Portsmouth Harbour | 75,400 | 73.0% | 7.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out