Hilsea
HLSSouth EastManaged by South Western Railway
How this station is performing
Hilsea had 60,016 scheduled stops to Period 7 of 2026-27, about 165 a day. 76.7% of recorded arrivals were within three minutes of the timetable and 4.1% of scheduled stops were cancelled.
Hilsea opened on 2 November 1941, 85 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Hilsea is the newest; the oldest, Portsmouth and Southsea, opened in 1847.
The nearest stations to Hilsea are Cosham (1.7 km north), Fratton (3.7 km south), Portsmouth and Southsea (4.0 km south-west), Portsmouth Harbour (5.0 km south-west) and Portchester (5.2 km north-west). 10 stations lie within 10 km in all. At 76.7%, Hilsea is more punctual than every one of them; the best of the five, Portchester, manages 75.9%.
Hilsea takes its name from a suburb called Hilsea, home to about 13,552 people, and the station stands 0.8 km from its centre.
2 operators call at Hilsea: South Western Railway (75.7%, 66% of stops) and GTR (78.6%, 34% of stops). They are close together, with GTR leading on 78.6% and South Western Railway trailing on 75.7%, a gap of 2.9 percentage points.
1 of 3 stations of a similar size in South East are more punctual than Hilsea on 76.7%. The comparison group includes Hassocks (74.8%), Eastbourne (78.1%) and Bletchley (75.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 39,839 | 75.7% | 2.5% |
| GTR | 20,177 | 78.6% | 7.1% |
Operators with their own page for this station are linked to it.
Late train at Hilsea? Delay Repay
These operators call at Hilsea and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,573 | 69.0% | 3.7% |
| Period 6 of 2026-27 | 4,112 | 71.5% | 3.2% |
| Period 5 of 2026-27 | 4,854 | 72.4% | 5.6% |
| Period 4 of 2026-27 | 4,767 | 74.5% | 4.5% |
| Period 3 of 2026-27 | 4,730 | 77.5% | 4.8% |
| Period 2 of 2026-27 | 3,855 | 77.0% | 4.8% |
| Period 1 of 2026-27 | 5,097 | 82.3% | 3.4% |
| Period 13 of 2025-26 | 4,553 | 83.3% | 4.5% |
| Period 12 of 2025-26 | 4,658 | 81.2% | 2.9% |
| Period 11 of 2025-26 | 4,855 | 81.9% | 3.4% |
| Period 10 of 2025-26 | 4,190 | 73.8% | 4.6% |
| Period 9 of 2025-26 | 4,855 | 71.5% | 3.6% |
| Period 8 of 2025-26 | 4,917 | 79.3% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hassocks | 59,898 | 74.8% | 5.3% |
| Eastbourne | 60,487 | 78.1% | 2.8% |
| Bletchley | 60,927 | 75.0% | 5.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out