Eastbourne
EBNSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Eastbourne had 60,487 scheduled stops to Period 7 of 2026-27, about 166 a day. 78.1% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Eastbourne opened on 15 May 1849, 177 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Pevensey and Westham is the oldest (1846) and Normans Bay the newest (1905), with Eastbourne in between.
The nearest stations to Eastbourne are Hampden Park (Sussex) (2.9 km north), Pevensey and Westham (6.0 km north-east), Polegate (6.2 km north-west), Pevensey Bay (6.9 km north-east) and Normans Bay (9.9 km north-east). 5 stations lie within 10 km in all. Of the five, Hampden Park (Sussex) is the most punctual at 80.0% and Pevensey and Westham the least at 76.6%, with Eastbourne on 78.1%.
Eastbourne is one of 2 stations named after a big city called Eastbourne, home to about 101,689 people; this one stands 0.5 km from its centre.
Compared with 3 stations of a similar size in South East, Eastbourne is the most punctual, at 78.1%. The comparison group includes Bletchley (75.0%), Hilsea (76.7%) and Hassocks (74.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 60,487 | 78.1% | 2.8% |
Operators with their own page for this station are linked to it.
Late train at Eastbourne? Delay Repay
These operators call at Eastbourne and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,683 | 63.2% | 4.6% |
| Period 6 of 2026-27 | 4,434 | 44.1% | 2.9% |
| Period 5 of 2026-27 | 4,312 | 72.9% | 5.6% |
| Period 4 of 2026-27 | 4,725 | 80.9% | 2.2% |
| Period 3 of 2026-27 | 4,651 | 80.0% | 4.2% |
| Period 2 of 2026-27 | 4,712 | 81.2% | 3.7% |
| Period 1 of 2026-27 | 5,275 | 86.8% | 2.6% |
| Period 13 of 2025-26 | 5,133 | 88.2% | 2.1% |
| Period 12 of 2025-26 | 4,609 | 85.7% | 0.8% |
| Period 11 of 2025-26 | 4,682 | 84.1% | 1.2% |
| Period 10 of 2025-26 | 4,253 | 83.5% | 1.9% |
| Period 9 of 2025-26 | 4,642 | 80.5% | 1.7% |
| Period 8 of 2025-26 | 4,376 | 79.3% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out