Hassocks
HSKSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Hassocks had 59,898 scheduled stops to Period 7 of 2026-27, about 165 a day. 74.8% of recorded arrivals were within three minutes of the timetable and 5.3% of scheduled stops were cancelled.
Hassocks opened on 21 September 1841, 185 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Hassocks is the oldest; the next oldest, Burgess Hill, dates from 1841.
The nearest stations to Hassocks are Burgess Hill (3.4 km north), Wivelsfield (4.7 km north), Plumpton (6.0 km east), Falmer (8.1 km south-east) and Preston Park (8.8 km south). 9 stations lie within 10 km in all. Of the five, Falmer is the most punctual at 89.1% and Plumpton the least at 67.8%, with Hassocks on 74.8%.
Hassocks takes its name from a Village called Hassocks, home to about 8,499 people, and the station stands 0.4 km from its centre.
For Hassocks, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 59.0% of stops arrived within three minutes of the timetable. The strongest was Period 13 of 2025-26, at 84.5%, which is 25.5 percentage points higher.
2 of 3 stations of a similar size in South East are more punctual than Hassocks on 74.8%. The comparison group includes Hilsea (76.7%), Eastbourne (78.1%) and Cosham (71.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 59,898 | 74.8% | 5.3% |
Operators with their own page for this station are linked to it.
Late train at Hassocks? Delay Repay
These operators call at Hassocks and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,393 | 69.3% | 4.5% |
| Period 6 of 2026-27 | 4,698 | 59.0% | 6.4% |
| Period 5 of 2026-27 | 4,681 | 68.7% | 6.4% |
| Period 4 of 2026-27 | 4,664 | 74.9% | 5.9% |
| Period 3 of 2026-27 | 4,348 | 74.9% | 5.6% |
| Period 2 of 2026-27 | 4,441 | 79.7% | 6.3% |
| Period 1 of 2026-27 | 5,340 | 83.5% | 4.0% |
| Period 13 of 2025-26 | 4,896 | 84.5% | 3.8% |
| Period 12 of 2025-26 | 4,542 | 78.1% | 3.8% |
| Period 11 of 2025-26 | 4,457 | 78.6% | 3.4% |
| Period 10 of 2025-26 | 4,164 | 77.7% | 4.9% |
| Period 9 of 2025-26 | 4,544 | 66.0% | 7.4% |
| Period 8 of 2025-26 | 4,730 | 75.5% | 6.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hilsea | 60,016 | 76.7% | 4.1% |
| Eastbourne | 60,487 | 78.1% | 2.8% |
| Cosham | 58,993 | 71.7% | 4.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out