Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

GTR at Hilsea

All trains at HilseaGTR across BritainSouth East

On time, last 13 periods78.6%Whole station: 76.7%
Cancelled7.1%Whole station: 4.1%
Scheduled stops20,177Of 60,016 at the station

How this operator is doing here

GTR had 20,177 scheduled stops at Hilsea in the 13 periods to Period 7 of 2026-27, 34% of the station's total. 78.6% of recorded arrivals came within three minutes and 7.1% of stops were cancelled.

GTR trains at Hilsea also serve Cosham (1.7 km north, 75.5% on time, 5.7% cancelled), Fratton (3.7 km south, 73.2% on time, 9.6% cancelled), Portsmouth and Southsea (4.0 km south-west, 73.7% on time, 13.4% cancelled), Portsmouth Harbour (5.0 km south-west, 77.2% on time, 15.5% cancelled), Portchester (5.2 km north-west, 79.2% on time, 5.7% cancelled) and Bedhampton (5.2 km north-east, 75.1% on time, 5.0% cancelled), which are the stations on its network closest to Hilsea.

Within 30 km of here, GTR runs best at Bognor Regis, 27.3 km east (89.2%), and worst at Bosham, 14.9 km east (71.6%).

The busiest GTR station within 30 km of Hilsea is Barnham, 29.4 km east, with about 331 scheduled stops a day.

GTR at Hilsea has slipped sharply. 78.6% of stops came within three minutes of the timetable in the latest 13 periods, 5.4 percentage points worse than the 84.0% recorded in the 13 before. Cancellations rose to 7.1% of scheduled stops from 5.5%, which is 1.6 percentage points more.

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 86.9%Period 2 of 2023-24: 85.4%Period 3 of 2023-24: 82.2%Period 4 of 2023-24: 84.6%Period 5 of 2023-24: 87.1%Period 6 of 2023-24: 88.1%Period 7 of 2023-24: 84.6%Period 8 of 2023-24: 74.8%Period 9 of 2023-24: 76.2%Period 10 of 2023-24: 80.2%Period 11 of 2023-24: 84.6%Period 12 of 2023-24: 87.8%Period 13 of 2023-24: 89.1%Period 1 of 2024-25: 81.7%Period 2 of 2024-25: 87.1%Period 3 of 2024-25: 84.6%Period 4 of 2024-25: 86.2%Period 5 of 2024-25: 85.5%Period 6 of 2024-25: 81.7%Period 7 of 2024-25: 86.0%Period 8 of 2024-25: 83.5%Period 9 of 2024-25: 78.2%Period 10 of 2024-25: 83.2%Period 11 of 2024-25: 84.7%Period 12 of 2024-25: 79.8%Period 13 of 2024-25: 87.6%Period 1 of 2025-26: 88.8%Period 2 of 2025-26: 88.8%Period 3 of 2025-26: 86.6%Period 4 of 2025-26: 77.3%Period 5 of 2025-26: 85.3%Period 6 of 2025-26: 83.6%Period 7 of 2025-26: 82.7%Period 8 of 2025-26: 80.5%Period 9 of 2025-26: 75.5%Period 10 of 2025-26: 78.7%Period 11 of 2025-26: 83.2%Period 12 of 2025-26: 80.7%Period 13 of 2025-26: 83.6%Period 1 of 2026-27: 85.4%Period 2 of 2026-27: 83.7%Period 3 of 2026-27: 80.3%Period 4 of 2026-27: 78.9%Period 5 of 2026-27: 70.2%Period 6 of 2026-27: 65.7%Period 7 of 2026-27: 70.2%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 1.1%Period 2 of 2023-24: 6.2%Period 3 of 2023-24: 1.7%Period 4 of 2023-24: 4.6%Period 5 of 2023-24: 2.6%Period 6 of 2023-24: 4.1%Period 7 of 2023-24: 1.7%Period 8 of 2023-24: 2.0%Period 9 of 2023-24: 2.8%Period 10 of 2023-24: 12.6%Period 11 of 2023-24: 1.5%Period 12 of 2023-24: 1.3%Period 13 of 2023-24: 1.7%Period 1 of 2024-25: 5.5%Period 2 of 2024-25: 2.5%Period 3 of 2024-25: 9.3%Period 4 of 2024-25: 3.3%Period 5 of 2024-25: 3.7%Period 6 of 2024-25: 6.1%Period 7 of 2024-25: 8.6%Period 8 of 2024-25: 5.2%Period 9 of 2024-25: 6.0%Period 10 of 2024-25: 4.0%Period 11 of 2024-25: 4.7%Period 12 of 2024-25: 4.6%Period 13 of 2024-25: 5.6%Period 1 of 2025-26: 2.6%Period 2 of 2025-26: 4.0%Period 3 of 2025-26: 6.6%Period 4 of 2025-26: 8.6%Period 5 of 2025-26: 5.3%Period 6 of 2025-26: 6.3%Period 7 of 2025-26: 7.2%Period 8 of 2025-26: 5.7%Period 9 of 2025-26: 6.3%Period 10 of 2025-26: 8.1%Period 11 of 2025-26: 6.5%Period 12 of 2025-26: 4.1%Period 13 of 2025-26: 8.3%Period 1 of 2026-27: 5.0%Period 2 of 2026-27: 5.0%Period 3 of 2026-27: 9.3%Period 4 of 2026-27: 8.3%Period 5 of 2026-27: 11.7%Period 6 of 2026-27: 9.0%Period 7 of 2026-27: 5.7%2023-242024-252025-262026-27

See how GTR Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,58770.2%5.7%
Period 6 of 2026-271,02865.7%9.0%
Period 5 of 2026-271,65670.2%11.7%
Period 4 of 2026-271,65678.9%8.3%
Period 3 of 2026-271,56680.3%9.3%
Period 2 of 2026-271,31183.7%5.0%
Period 1 of 2026-271,79485.4%5.0%
Period 13 of 2025-261,58783.6%8.3%
Period 12 of 2025-261,58780.7%4.1%
Period 11 of 2025-261,65683.2%6.5%
Period 10 of 2025-261,43778.7%8.1%
Period 9 of 2025-261,65675.5%6.3%
Period 8 of 2025-261,65680.5%5.7%

Time of year

70%75%80%85%90%P1: 86.2%1P2: 86.5%2P3: 83.6%3P4: 81.4%4P5: 81.5%5P6: 80.1%6P7: 80.4%7P8: 80.5%8P9: 76.7%9P10: 80.8%10P11: 84.1%11P12: 82.1%12P13: 86.4%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Hilsea

OperatorScheduled stopsWithin 3 minCancelled
South Western Railway39,83975.7%2.5%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out