GTR had 20,177 scheduled stops at Hilsea in the 13 periods to Period 7 of 2026-27, 34% of the station's total. 78.6% of recorded arrivals came within three minutes and 7.1% of stops were cancelled.
GTR trains at Hilsea also serve Cosham (1.7 km north, 75.5% on time, 5.7% cancelled), Fratton (3.7 km south, 73.2% on time, 9.6% cancelled), Portsmouth and Southsea (4.0 km south-west, 73.7% on time, 13.4% cancelled), Portsmouth Harbour (5.0 km south-west, 77.2% on time, 15.5% cancelled), Portchester (5.2 km north-west, 79.2% on time, 5.7% cancelled) and Bedhampton (5.2 km north-east, 75.1% on time, 5.0% cancelled), which are the stations on its network closest to Hilsea.
Within 30 km of here, GTR runs best at Bognor Regis, 27.3 km east (89.2%), and worst at Bosham, 14.9 km east (71.6%).
The busiest GTR station within 30 km of Hilsea is Barnham, 29.4 km east, with about 331 scheduled stops a day.
GTR at Hilsea has slipped sharply. 78.6% of stops came within three minutes of the timetable in the latest 13 periods, 5.4 percentage points worse than the 84.0% recorded in the 13 before. Cancellations rose to 7.1% of scheduled stops from 5.5%, which is 1.6 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,587 | 70.2% | 5.7% |
| Period 6 of 2026-27 | 1,028 | 65.7% | 9.0% |
| Period 5 of 2026-27 | 1,656 | 70.2% | 11.7% |
| Period 4 of 2026-27 | 1,656 | 78.9% | 8.3% |
| Period 3 of 2026-27 | 1,566 | 80.3% | 9.3% |
| Period 2 of 2026-27 | 1,311 | 83.7% | 5.0% |
| Period 1 of 2026-27 | 1,794 | 85.4% | 5.0% |
| Period 13 of 2025-26 | 1,587 | 83.6% | 8.3% |
| Period 12 of 2025-26 | 1,587 | 80.7% | 4.1% |
| Period 11 of 2025-26 | 1,656 | 83.2% | 6.5% |
| Period 10 of 2025-26 | 1,437 | 78.7% | 8.1% |
| Period 9 of 2025-26 | 1,656 | 75.5% | 6.3% |
| Period 8 of 2025-26 | 1,656 | 80.5% | 5.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Hilsea
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 39,839 | 75.7% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out