High Brooms
HIBSouth EastManaged by Southeastern
How this station is performing
High Brooms had 40,816 scheduled stops to Period 7 of 2026-27, about 112 a day. 73.0% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
High Brooms opened on 1 March 1893, 133 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Tonbridge is the oldest (1842) and Leigh (Kent) the newest (1911), with High Brooms in between.
The nearest stations to High Brooms are Tunbridge Wells (2.4 km south-west), Tonbridge (4.7 km north), Frant (5.2 km south), Leigh (Kent) (6.8 km north-west) and Hildenborough (8.0 km north-west). 10 stations lie within 10 km in all. Of the five, Leigh (Kent) is the most punctual at 87.4% and Hildenborough the least at 70.3%, with High Brooms on 73.0%.
High Brooms takes its name from a Village called High Brooms, and the station stands 0.1 km from its centre.
For High Brooms, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 55.3% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 86.9%, which is 31.6 percentage points higher. Cancellations peaked at 6.7% of scheduled stops in Period 10 of 2023-24, against 2.2% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, High Brooms is the least punctual, at 73.0%. All of them are ahead, including Oxted (80.4%), Broadstairs (78.8%) and Moulsecoomb (91.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 40,816 | 73.0% | 2.2% |
Operators with their own page for this station are linked to it.
Late train at High Brooms? Delay Repay
These operators call at High Brooms and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,011 | 58.6% | 2.2% |
| Period 6 of 2026-27 | 3,105 | 55.3% | 1.4% |
| Period 5 of 2026-27 | 3,260 | 68.1% | 3.5% |
| Period 4 of 2026-27 | 3,138 | 78.1% | 1.1% |
| Period 3 of 2026-27 | 3,161 | 77.3% | 2.5% |
| Period 2 of 2026-27 | 2,992 | 78.1% | 2.5% |
| Period 1 of 2026-27 | 3,530 | 81.2% | 1.7% |
| Period 13 of 2025-26 | 3,481 | 78.9% | 2.1% |
| Period 12 of 2025-26 | 3,173 | 80.0% | 2.2% |
| Period 11 of 2025-26 | 3,147 | 77.1% | 1.8% |
| Period 10 of 2025-26 | 2,460 | 72.6% | 2.6% |
| Period 9 of 2025-26 | 3,171 | 68.0% | 3.3% |
| Period 8 of 2025-26 | 3,187 | 72.6% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Oxted | 40,874 | 80.4% | 2.7% |
| Broadstairs | 40,890 | 78.8% | 1.9% |
| Moulsecoomb | 40,897 | 91.0% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out