Moulsecoomb
MCBSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Moulsecoomb had 40,897 scheduled stops to Period 7 of 2026-27, about 112 a day. 91.0% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Moulsecoomb opened on 12 May 1980, 46 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Moulsecoomb is the newest; the oldest, Brighton, opened in 1840.
The nearest stations to Moulsecoomb are London Road (Brighton) (1.6 km south-west), Brighton (2.5 km south-west), Preston Park (2.5 km west), Falmer (2.8 km north-east) and Hove (3.8 km west). 12 stations lie within 10 km in all. Of the five, London Road (Brighton) is the most punctual at 91.4% and Preston Park the least at 76.3%, with Moulsecoomb on 91.0%.
Moulsecoomb takes its name from a suburb called Moulsecoomb, home to about 17,472 people, and the station stands 0.7 km from its centre.
For Moulsecoomb, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 71.2% of stops arrived within three minutes of the timetable. The strongest was Period 4 of 2024-25, at 97.1%, which is 25.9 percentage points higher. Cancellations peaked at 5.2% of scheduled stops in Period 8 of 2023-24, against 1.8% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Moulsecoomb is the most punctual, at 91.0%. The comparison group includes Broadstairs (78.8%), Oxted (80.4%) and Tunbridge Wells (73.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 40,897 | 91.0% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Moulsecoomb? Delay Repay
These operators call at Moulsecoomb and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,152 | 89.3% | 2.3% |
| Period 6 of 2026-27 | 3,141 | 71.2% | 1.3% |
| Period 5 of 2026-27 | 2,822 | 87.1% | 2.2% |
| Period 4 of 2026-27 | 3,157 | 93.7% | 2.3% |
| Period 3 of 2026-27 | 3,088 | 92.7% | 2.8% |
| Period 2 of 2026-27 | 3,066 | 92.3% | 3.7% |
| Period 1 of 2026-27 | 3,613 | 89.8% | 2.1% |
| Period 13 of 2025-26 | 3,462 | 95.6% | 1.1% |
| Period 12 of 2025-26 | 3,158 | 95.0% | 1.1% |
| Period 11 of 2025-26 | 3,164 | 94.5% | 1.1% |
| Period 10 of 2025-26 | 2,733 | 94.8% | 0.8% |
| Period 9 of 2025-26 | 3,164 | 93.9% | 0.9% |
| Period 8 of 2025-26 | 3,177 | 92.4% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Broadstairs | 40,890 | 78.8% | 1.9% |
| Oxted | 40,874 | 80.4% | 2.7% |
| Tunbridge Wells | 40,957 | 73.2% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out