Broadstairs
BSRSouth EastManaged by Southeastern
How this station is performing
Broadstairs had 40,890 scheduled stops to Period 7 of 2026-27, about 112 a day. 78.8% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Broadstairs opened on 5 October 1863, 163 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Ramsgate is the oldest (1846) and Thanet Parkway the newest (2023), with Broadstairs in between.
The nearest stations to Broadstairs are Dumpton Park (1.7 km south), Ramsgate (2.9 km south-west), Margate (5.0 km north-west), Thanet Parkway (6.0 km south-west) and Westgate-on-Sea (7.0 km west). 7 stations lie within 10 km in all. Of the five, Dumpton Park is the most punctual at 80.8% and Margate the least at 77.1%, with Broadstairs on 78.8%.
Broadstairs takes its name from a town called Broadstairs, home to about 24,903 people, and the station stands 0.5 km from its centre.
For Broadstairs, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 68.5% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 90.0%, which is 21.5 percentage points higher. Cancellations peaked at 5.0% of scheduled stops in Period 4 of 2025-26, against 1.9% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Broadstairs on 78.8%. The comparison group includes Moulsecoomb (91.0%), Oxted (80.4%) and Tunbridge Wells (73.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 40,890 | 78.8% | 1.9% |
Operators with their own page for this station are linked to it.
Late train at Broadstairs? Delay Repay
These operators call at Broadstairs and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,185 | 74.8% | 2.0% |
| Period 6 of 2026-27 | 3,210 | 68.5% | 1.7% |
| Period 5 of 2026-27 | 3,307 | 72.6% | 1.4% |
| Period 4 of 2026-27 | 3,290 | 81.5% | 1.9% |
| Period 3 of 2026-27 | 3,042 | 76.5% | 3.7% |
| Period 2 of 2026-27 | 3,106 | 76.1% | 2.6% |
| Period 1 of 2026-27 | 3,238 | 87.0% | 2.3% |
| Period 13 of 2025-26 | 3,456 | 86.0% | 2.3% |
| Period 12 of 2025-26 | 3,045 | 87.1% | 1.1% |
| Period 11 of 2025-26 | 2,993 | 85.6% | 1.1% |
| Period 10 of 2025-26 | 2,798 | 78.3% | 1.2% |
| Period 9 of 2025-26 | 3,083 | 73.4% | 0.9% |
| Period 8 of 2025-26 | 3,137 | 77.1% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Moulsecoomb | 40,897 | 91.0% | 1.8% |
| Oxted | 40,874 | 80.4% | 2.7% |
| Tunbridge Wells | 40,957 | 73.2% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out