Southeastern at Herne Hill
How this operator is doing here
Southeastern had 46,522 scheduled stops at Herne Hill in the 13 periods to Period 7 of 2026-27, 49% of the station's total. 80.8% of recorded arrivals came within three minutes and 2.4% of stops were cancelled.
Southeastern trains at Herne Hill also serve Brixton (1.3 km north-west, 84.3% on time, 2.8% cancelled), Loughborough Junction (1.4 km north, 90.2% on time, 2.2% cancelled), West Dulwich (1.7 km south-east, 81.3% on time, 2.6% cancelled), Denmark Hill (1.9 km north-east, 83.8% on time, 2.3% cancelled), Sydenham Hill (2.8 km south-east, 83.9% on time, 2.6% cancelled) and Peckham Rye (2.9 km north-east, 81.3% on time, 2.0% cancelled), which are the stations on its network closest to Herne Hill.
Within 30 km of here, Southeastern runs best at Sundridge Park, 9.6 km south-east (99.4%), and worst at Sevenoaks, 27.9 km south-east (72.3%).
The busiest Southeastern station within 30 km of Herne Hill is London Bridge, 5.9 km north, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Herne Hill, Southeastern is the least punctual, at 80.8%.
Southeastern at Herne Hill has not moved in one direction over three full railway years: 77.5% within three minutes in 2023-24, 83.0% in 2024-25 and 82.4% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,697 | 81.4% | 1.7% |
| Period 6 of 2026-27 | 3,673 | 76.4% | 2.6% |
| Period 5 of 2026-27 | 2,620 | 68.8% | 2.4% |
| Period 4 of 2026-27 | 3,765 | 84.7% | 2.4% |
| Period 3 of 2026-27 | 3,730 | 79.6% | 3.1% |
| Period 2 of 2026-27 | 3,599 | 83.3% | 3.8% |
| Period 1 of 2026-27 | 4,092 | 89.2% | 1.4% |
| Period 13 of 2025-26 | 4,080 | 87.1% | 1.2% |
| Period 12 of 2025-26 | 3,732 | 82.8% | 1.4% |
| Period 11 of 2025-26 | 3,768 | 82.2% | 1.4% |
| Period 10 of 2025-26 | 2,397 | 76.3% | 4.6% |
| Period 9 of 2025-26 | 3,593 | 76.4% | 3.1% |
| Period 8 of 2025-26 | 3,776 | 74.7% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Herne Hill
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 48,301 | 81.7% | 8.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out