GTR at Herne Hill
How this operator is doing here
GTR had 48,301 scheduled stops at Herne Hill in the 13 periods to Period 7 of 2026-27, 51% of the station's total. 81.7% of recorded arrivals came within three minutes and 8.2% of stops were cancelled.
GTR trains at Herne Hill also serve North Dulwich (1.0 km east, 95.2% on time, 2.6% cancelled), Loughborough Junction (1.4 km north, 82.9% on time, 8.3% cancelled), Tulse Hill (1.5 km south, 89.6% on time, 5.4% cancelled), East Dulwich (1.7 km north-east, 96.0% on time, 2.6% cancelled), Denmark Hill (1.9 km north-east, 86.8% on time, 4.0% cancelled) and West Norwood (2.4 km south, 95.1% on time, 2.8% cancelled), which are the stations on its network closest to Herne Hill.
Within 30 km of here, GTR runs best at Birkbeck, 6.4 km south-east (98.1%), and worst at Kenley, 14.3 km south (66.9%).
The busiest GTR station within 30 km of Herne Hill is East Croydon, 8.7 km south, with about 813 scheduled stops a day.
GTR at Herne Hill has slipped a little, from 86.1% within three minutes in the previous 13 periods to 81.7% in the latest 13, a fall of 4.4 percentage points. Cancellations fell to 8.2% of scheduled stops from 8.7%, which is 0.5 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,873 | 76.2% | 5.8% |
| Period 6 of 2026-27 | 3,816 | 75.3% | 10.5% |
| Period 5 of 2026-27 | 3,809 | 75.4% | 11.6% |
| Period 4 of 2026-27 | 3,865 | 82.4% | 5.9% |
| Period 3 of 2026-27 | 3,328 | 80.6% | 9.3% |
| Period 2 of 2026-27 | 3,359 | 85.9% | 5.0% |
| Period 1 of 2026-27 | 4,109 | 86.0% | 6.6% |
| Period 13 of 2025-26 | 4,130 | 86.7% | 6.6% |
| Period 12 of 2025-26 | 3,913 | 85.0% | 6.1% |
| Period 11 of 2025-26 | 3,808 | 80.8% | 8.3% |
| Period 10 of 2025-26 | 2,781 | 84.5% | 13.7% |
| Period 9 of 2025-26 | 3,672 | 80.4% | 13.6% |
| Period 8 of 2025-26 | 3,838 | 83.1% | 5.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Herne Hill
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 46,522 | 80.8% | 2.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out