GTR at Hendon
How this operator is doing here
GTR had 52,629 scheduled stops at Hendon in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 75.8% of recorded arrivals came within three minutes and 7.4% of stops were cancelled.
GTR trains at Hendon also serve Brent Cross West (1.5 km south-east, 74.0% on time, 7.1% cancelled), Cricklewood (3.0 km south-east, 72.3% on time, 7.3% cancelled), Mill Hill Broadway (3.7 km north, 70.4% on time, 6.6% cancelled), West Hampstead Thameslink (4.7 km south-east, 75.5% on time, 6.0% cancelled), Wembley Central (5.1 km south-west, 86.3% on time, 6.6% cancelled) and Harrow and Wealdstone (6.8 km west, 84.8% on time, 6.8% cancelled), which are the stations on its network closest to Hendon.
Within 30 km of here, GTR runs best at Birkbeck, 23.3 km south-east (98.1%), and worst at Kenley, 30.0 km south (66.9%).
The busiest GTR station within 30 km of Hendon is East Croydon, 24.9 km south-east, with about 813 scheduled stops a day.
GTR at Hendon has slipped a little, from 79.0% within three minutes in the previous 13 periods to 75.8% in the latest 13, a fall of 3.2 percentage points. Cancellations fell to 7.4% of scheduled stops from 8.8%, which is 1.4 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,119 | 73.5% | 5.8% |
| Period 6 of 2026-27 | 4,083 | 69.8% | 8.6% |
| Period 5 of 2026-27 | 4,133 | 72.9% | 10.4% |
| Period 4 of 2026-27 | 4,073 | 74.0% | 5.0% |
| Period 3 of 2026-27 | 3,392 | 75.1% | 6.5% |
| Period 2 of 2026-27 | 3,795 | 77.8% | 5.0% |
| Period 1 of 2026-27 | 4,595 | 79.3% | 5.7% |
| Period 13 of 2025-26 | 4,506 | 80.4% | 5.9% |
| Period 12 of 2025-26 | 4,202 | 79.8% | 5.2% |
| Period 11 of 2025-26 | 4,162 | 72.9% | 9.2% |
| Period 10 of 2025-26 | 3,413 | 77.2% | 10.4% |
| Period 9 of 2025-26 | 4,059 | 75.0% | 12.1% |
| Period 8 of 2025-26 | 4,097 | 77.1% | 6.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Hendon
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 2 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out