Barnsley
BNYYorkshire and The HumberManaged by Northern Trains
How this station is performing
Barnsley had 46,768 scheduled stops to Period 7 of 2026-27, about 128 a day. 78.0% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Barnsley opened on 1 January 1850, 176 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Barnsley is the oldest; the next oldest, Darton, dates from 1850.
The nearest stations to Barnsley are Dodworth (3.8 km west), Darton (5.1 km north-west), Wombwell (5.8 km south-east), Silkstone Common (6.0 km west) and Elsecar (7.0 km south-east). 5 stations lie within 10 km in all. Of the five, Wombwell is the most punctual at 79.7% and Silkstone Common the least at 72.7%, with Barnsley on 78.0%.
Barnsley is one of 3 stations named after a town called Barnsley, home to about 245,199 people; this one stands 0.1 km from its centre.
Across the whole run of data, the weakest four-week period for Barnsley was Period 9 of 2023-24, at 66.4%, some time before the latest year. The strongest was Period 2 of 2024-25, at 86.4%, and the two are 20.0 percentage points apart. Cancellations peaked at 13.4% of scheduled stops in Period 10 of 2024-25, against 1.9% over the latest 13 periods.
1 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Barnsley on 78.0%. The comparison group includes Selby (73.8%), Steeton and Silsden (89.5%) and Todmorden (63.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 46,768 | 78.0% | 1.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,549 | 80.3% | 1.6% |
| Period 6 of 2026-27 | 3,584 | 80.1% | 1.2% |
| Period 5 of 2026-27 | 3,584 | 77.5% | 1.9% |
| Period 4 of 2026-27 | 3,582 | 78.8% | 3.5% |
| Period 3 of 2026-27 | 3,584 | 76.1% | 2.3% |
| Period 2 of 2026-27 | 3,581 | 75.2% | 2.1% |
| Period 1 of 2026-27 | 4,137 | 81.4% | 1.1% |
| Period 13 of 2025-26 | 3,927 | 83.2% | 1.0% |
| Period 12 of 2025-26 | 3,278 | 75.7% | 3.0% |
| Period 11 of 2025-26 | 3,581 | 79.6% | 1.4% |
| Period 10 of 2025-26 | 3,237 | 76.9% | 2.2% |
| Period 9 of 2025-26 | 3,572 | 70.5% | 2.0% |
| Period 8 of 2025-26 | 3,572 | 76.7% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Selby | 46,066 | 73.8% | 2.0% |
| Steeton and Silsden | 44,690 | 89.5% | 1.3% |
| Todmorden | 49,080 | 63.2% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out